BOILER COMMISSIONING
(INITIAL CHECK)
To commission the boiler:
- make sure that the type of gas used corresponds
to boiler settings;
- check connection to a 230V-50Hz power
mains, correct L-N polarity and the earthing
connection;
- switch the boiler on and check correct ignition;
- check the CO
2
in the fumes at maximum and
minimum flow rate;
- make sure the fan rpm matches the value pro-
vided in the book (Par. 3.24);
- check activation of the safety device in the event
of no gas, as well as the relative activation time;
- check the intervention of the main switch
located upstream of the boiler and in the boiler;
- check the existing draught during normal
functioning of the appliance, e.g. a draught
gauge positioned at the exit of the appliance
combustion products;
- check that there is no backflow of combustion
products into the room, even during function-
ing of fans;
- check that the intake and/or exhaust terminals
are not blocked;
- ensure activation of all adjustment devices;
- seal the gas flow rate regulation devices (if
settings are modified);
- check sealing efficiency of water circuits;
- check ventilation and/or aeration of the instal-
lation room where provided.
If even only a single safety check offers a negative
result, do not commission the system.
3.1 HYDRAULIC DIAGRAM.
Key:
1 - Draining funnel on view
2 - Boiler draining valve
3 - 4 bar safety valve
4 - Flow manifold
5 - Absolute pressure switch
6 - Condensate trap siphon
7 - Gas nozzle
8 - Air fan
9 - Manifold cover
10 - Ignition electrode
11 - Condensation module cover
12 - Condensation module
13 - Air pressure switch
14 - Flue probe
15 - Condensing module air vent valve
16 - Thermofuse
17 - Air sample point
18 - Flue sample point
19 - Venturi positive sign (P2)
20 - Fumes hood
21 - Heat-exchanger safety thermostat
(manual reset)
22 - Over temperature safety thermostat
23 - System return regulation probe
24 - System flow regulation probe
25 - Detection electrode
26 - System flow meter
27 - Burner
28 - Air intake pipe
29 - Sleeve with seats for Venturi
30 - Automatic vent valve
31 - Boiler circulator pump
32 - Gas valve
M - System flow
SC - Condensate drain
G - Gas supply
R - System return
Содержание VICTRIX PRO 35 2ErP
Страница 1: ...IE Instruction and warning book VICTRIX PRO 35 55 2 ErP 1 041662ENG...
Страница 2: ......
Страница 38: ...38 3 15 1 6 8 9 9 12 12 10 11 13 13 13 13 A A Rif A 7 7 Ref A...
Страница 49: ...49...
Страница 50: ...50...
Страница 51: ...51...