1.9  SYSTEM FILLING.

Once the boiler is connected, proceed with 

system filling via the filling valve (Fig. 2-2). 

Filling is performed at low speed to ensure 

release of air bubbles in the water via the boiler 

and heating system vents. The boiler has a built-

in automatic venting valve on the circulator. 

Open the radiator vent valves. Close radiator 

vent valves when only water escapes from them.

Close the filling valve when the boiler pressure 

gauge indicates approx. 1.2 bar.

N.B.:

 during these operations start up the 

circulation pump at intervals, acting on the main 

switch positioned on the control panel. 

Vent the 

circulation pump by loosening the front cap and 

keeping the motor running.

Tighten the cap after the operation.

1.10 GAS SYSTEM START-UP.

To start up the system, make reference to the 

Standard: This divides the systems and therefore 

the start-up operations into three categories: new 

systems, modified systems, re-activated systems. 

In particular, for new gas systems:

- open windows and doors;
- avoid presence of sparks or open flames;
- bleed all air from the pipelines;
-  check that the internal system is properly sealed 

according to specifications.

1.11 BOILER START-UP (IGNITION).

To issue the required Declaration of Conformity, 

the following must be performed for boiler 

start-up:

-  check that the internal system is properly sealed 

according to the regulations in force;

-  make sure that the type of gas used corresponds 

to boiler settings;

-  switch the boiler on and check correct ignition;
- make sure that the gas flow rate and relevant 

pressure values comply with those given in the 

manual (par. 3.16);

- check the correct ventilation of the rooms;
- check the existing draught during normal 

functioning of the appliance, e.g. a draught 

gauge positioned at the exit of the appliance 

combustion products;

-  check that there is no backflow of combustion 

products into the room, even during 

functioning of fans;

- ensure that the safety device intervenes in the 

event of gas supply failure and check the relative 

intervention time;

- check activation of the main switch located 

upstream of the boiler.

The boiler must not be started up even if only 

one of the checks should be negative.

N.B.:

 The preliminary boiler check must be carried 

out by a qualified technician. The standard boiler 

warranty is valid from the date of inspection.

The test certificate and warranty is issued to the 

user.

Fig. 1-7

Head available to the system.

1.12 CIRCULATION PUMP.

The boilers are supplied with a built-in circulation 

pump with 3-position electric speed control.

The boiler does not operate correctly with the 

circulation pump on first speed. 

To ensure optimal boiler operation, in the case 

of new systems (single pipe and module) it is 

recommended to use the pump at maximum 

speed. The circulation pump is already fitted 

with a capacitor.

Pump release.

 If, after a prolonged period of 

inactivity, the circulation pump is blocked, 

unscrew the front cap and turn the motor shaft 

using a screwdriver. Take great care during this 

operation to avoid damage to the motor.

1.13 KITS AVAILABLE ON REQUEST.

• System cut-off valves kit (on request). The 

boiler is designed for installation of system 

interception cocks to be placed on flow and 

return pipes of the connection assembly. This 

kit is particularly useful for maintenance as 

it allows the boiler to be drained separately 

without having to empty the entire system.

• Zone system kit (on request). If the heating 

system is to be divided into several zones 

(max. 

three),

 in order to interlock them with separate 

adjustments and to keep water flow rate high 

for each zone, Immergas supplies zone system 

kits by request. 

• Polyphosphate  dispenser  kit  (on  request). 

The polyphosphate dispenser reduces the 

formation of lime-scale and preserves the 

original heat exchange and domestic hot water 

production conditions. The boiler is prepared 

for application of the polyphosphate dispenser 

kit.

The above-mentioned kits are supplied complete 

with instructions for assembly and use.

H

ea

d (m H

2

O)

A =  Head available to the plant at the third speed (with automatic by-pass)

B  =  Head available to the plant at the second speed (with automatic by-pass)

Flow rate (l/h)

H

ea

d (kP

a)

A

B

Содержание NIKE MINI 28 KW SPECIAL

Страница 1: ...NIKE MINI 28 KW SPECIAL Instruction and warning booklet IE 1 038788ENG ...

Страница 2: ... technical information for installing Immergas boilers As for the other issues related to boiler installation e g safety in the work site environment protection injury prevention it is necessary to comply with the provisions specified in the regulations in force and principles of good practice In compliance with legislation in force the systems must be designed by qualified professionals within th...

Страница 3: ...al heating system pressure 12 2 9 System draining 12 2 10 Anti freeze protection 12 2 11 Case cleaning 12 2 12 Decommissioning 12 3 Boiler start up initial check 13 3 1 Hydraulic diagram 13 3 2 Wiring diagram 14 3 3 Troubleshooting 14 3 4 Converting the boiler to other types of gas 15 3 5 Checks following conversion to another type of gas 15 3 6 Possible adjustments of the gas valve 15 3 7 Program...

Страница 4: ...ates the warranty Installation regulations theseboilerscannotbeinstalledinbedrooms studio flats and bathrooms They also cannot be installed in rooms with wood or solid fuel burning heat generators and in adjacent and communicating rooms Installation in places with a fire risk is prohibited for example garages closed parkingstalls gasappliancesandrelativeflue ducts flue exhaust pipes and combustion...

Страница 5: ...e type used in the boiler which must comply with the regulations in force as insufficient levels can reduce generator output and cause malfunctions Ensure correct gas cock connection by following the mounting instructions illustrated in the figure The gas supply pipe must be suitably dimensioned according to current regulations in order to guarantee correct gas flow to the burnereveninconditionsof...

Страница 6: ...ergas chrono thermostats are connected with 2 wires only Carefully read the user and assembly instructions contained in the accessory kit On Offdigitalchrono thermostat Thechrono thermostat allows set two room temperature value one for daytime comfort temperature and one for nighttime lower temperature set a weekly programme with four daily switch on and switch off times select the required operat...

Страница 7: ... dangerous situations for the user The flue ducts must be connected to the chimney or flue in the same room in which the appliance is installed or at most in the adjoining room and must comply with the requirements indicated by the regulation 1 8 FLUES CHIMNEYS For the appliances with natural draught individual chimneys and branched flues can be used Individual chimneys The individual flues must b...

Страница 8: ...supplyfailureandchecktherelative intervention time check activation of the main switch located upstream of the boiler The boiler must not be started up even if only one of the checks should be negative N B The preliminary boiler check must be carried out by a qualified technician The standard boiler warranty is valid from the date of inspection The test certificate and warranty is issued to the us...

Страница 9: ...ety thermostat 6 Fumes hood 7 Delivery probe 8 Safety thermostat 9 System expansion vessel 10 Combustion chamber 11 Boiler circulator pump 12 3 bar safety valve 13 Automatic by pass 14 Three way valve motorised 15 System draining valve 16 Primary heat exchanger 17 Ignition and detection electrodes 18 Vent valve 19 DHW heat exchanger N B connection group optional ...

Страница 10: ... other devices Never clean the appliance or connected parts with easily flammable substances Never leave containers or flammable substances in the same environment as the appliance It is prohibited and dangerous to obstruct the air intake even partially for the ventilation of the room in which the boiler is installed Due to the danger functioning is also prohibited in the same room as suction devi...

Страница 11: ...and 7 flash at the same time 04 Parasite flame block LEDs 1 and 7 flash at the same time 20 Loss of remote control communication LEDs 2 and 3 flash alternately 31 Insufficient water circulation This occurs if there is overheating in the boiler due to insufficient water circulating in the primary circuit the causes can be low system circulation check that no shut off devices are closed on the heati...

Страница 12: ...rmal pressure via the valve located at the bottom of the boiler Fig 2 2 N B close the valve after the operation If pressure values reach around 3 bar the safety valve may be activated In this case contact a professional technician for assistance In the event of frequent pressure drops contact qualified staff for assistance to eliminate the possible system leakage 2 9 SYSTEM DRAINING To drain the b...

Страница 13: ...he appliance e g a draught gauge positioned at the exit of the appliance combustion products check that there is no backflow of combustion products into the room even during functioning of fans ensure activation of all adjustment devices seal the gas flow rate regulation devices if settings are modified check the production of domestic hot water check sealing efficiency of water circuits check ven...

Страница 14: ...ect installation of the terminal Frequent interventions of the over heating safety thermostat It can depend on reduced water pressure in the boiler little circulation in the heating system the blocked pump or an anomaly of the boiler P C B Check on the pressure gauge that the system pressure is within established limits Check that radiator valves are not all closed The boiler produces condensate T...

Страница 15: ...operations must be carried out by a qualified technician e g Immergas After Sales Technical Assistance Service Burner adjustment must be carried out using a U or digital pressure gauge connected to the gas valve outlet pressure point Part 4 Fig 3 3 keeping to the pressure value provided in the tables Par 3 16 according to the type of gas for which the boiler is prepared Fig 3 3 P C B SIT 845 GAS V...

Страница 16: ... tables Heating output The boiler is produced and calibrated in the central heating phase at nominal output Permanent reduction of the timer The boiler has an electronic timing device that prevents the burner from igniting too often in the heating phase The boiler has a standard supply of a timer adjusted at 180 seconds Heating switch on timer continuous variation Flashing LED slow 30 seconds LED ...

Страница 17: ...r with boiler in standby the function activates every 18 hours after the last boiler check power supply In case of functioning in domestic hot water mode the self check starts within 10 minutes after the end of the withdrawing in progress for duration of approx 10 seconds N B during self check the boiler remains off including signalling 3 14 YEARLY APPLIANCE CHECK AND MAINTENANCE The following che...

Страница 18: ...panel 4 towards you taking care to remove the 2 fixing screws 5 3 16 HEAT OUTPUT N B gasflowratesrefertoheatingpowerbelowa temperature of 15 C and a pressure of 1013 mbar Burner pressure values refer to use of gas at 15 C METHANE G20 BUTANE G30 PROPANE G31 THERMAL POWER THERMAL POWER BURNER GAS FLOW RATE PRESS BURNER NOZZLES BURNER GAS FLOW RATE PRESS BURNER NOZZLES BURNER GAS FLOW RATE PRESS BURN...

Страница 19: ...ic hot water circuit flow limiter at 2 bar l min 9 3 Domestic circuit min pressure dynamic bar 0 3 Domestic hot water circuit max working pressure bar 10 Minimum D H W flow rate l min 1 5 Specific flow rate T 30 C l min 12 8 Flow rate capacity in continuous duty T 30 C l min 13 2 Weight of full boiler kg 33 9 Weight of empty boiler kg 31 0 Electrical connection V Hz 230 50 Nominal absorption A 0 4...

Страница 20: ...d Model Cod Md Model code Sr N Serial Number CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum DHW heat input Qn min CH minimum heat input Qnw max DHW maximum heat input Qn max CH maximum heat input Pn min Minimum heat output Pn max Maximum heat output PMS Maximum system pressure PMW Maximum domestic hot water pressure D Specific flow rate TM Maximum operating te...

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ... immergas com Immergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 038788ENG rev 002114 000 07 15 Inglese per IRLANDA IE ...

Отзывы: