____________________________________________________________________________________
STI S.r.l.
– Via Dei Caravaggi 15, 24040 Levate (BG) – ITALY www.imi-critical.com
Manual 2071, rev.07 02/2019
– BV
6
5.6 Installation
Warning
Before proceeding with any installation, the following instructions must be
respected:
-
Always wear protective clothing, gloves, and eyewear to prevent personal
injury;
-
Check with your process or safety engineer for any additional measures that
must be taken to protect against process media.
5.6.1 Checks to be performed before installation
- Check that the coupling dimensions meet the specified coupling dimensions.
- Prepare the necessary tools for the assembly and setting of the unit.
- Check that the outer surface of the BV is free from dust and dirt.
- Clean the BV surfaces and remove anything that might prevent a perfect adherence.
5.6.2 Assembling of the BV
Threading
Material
Tightening torque [Nm]
M8
8.8
25
A4-70
20
5.6.3 Pneumatic connections
Warning
Check that the values of pneumatic supply available are compatible with those
reported on the identification plate of the BV. Use pipes and connections
appropriate as for type, rating, material and dimensions. The connection should be
made by qualified staff.
-
Properly deburr the ends of rigid pipes.
-
Properly clean the interior of pipes sending through them plenty of the supply fluid used in the
system.
-
Mould and fasten the connection pipes so that no irregular strains at entries or loosening of
threaded connections occur.
-
Use pipe sealant sparingly and only on male threads. A non-hardening sealant is strongly
recommended.
-
Make the connections according to the operating diagram.
-
Check the absence of leakages from pneumatic connections. If necessary, tighten the nuts of the
pipe-fittings.