CMN-91
Installation and Operation Manual
Installation
© 2016 Imagine Communications Corp. Proprietary and Confidential.
Revision D | Page 25
Installation
Installation Procedures
Inspecting the Shipment
Before installing the CMN-91, inspect the box and the contents. Report any damage to the shipper, and
then telephone the Imagine Communications Customer Service Department (see CMN-91 Service and
Support (on page 24)).
Refer to the enclosed packing sheet for the latest list of items that are supplied with the unit.
The box contains the following:
One CMN-91 monitor/scope
One CMN-91 Installation and Operation Manual on CD
One 75
terminator
One detachable power cord
One power supply assembly
One breakout connector (for LTC/GPI)
Save the box and packing material for any future shipping requirements.
Installing the Optional Battery to Power the
CMN-91
WARNING
The battery used in this device may present a risk of fire or chemical burn if mistreated. Do
not disassemble, incinerate, or heat above the manufacturer's maximum temperature limits.
See the manufacturer's documentation for the appropriate maximum temperature limits for
your selected battery.
Replace battery with an Anton-Bauer Dionic 90 or IDX Endura-7, -7S, -10, or -10S only
(depending on mount). Use of another battery may present a risk of fire or explosion.
Dispose of used battery properly. Keep away from children. Do not disassemble and do not dispose of in
fire.
The CMN-91 can be operated by plugging in the external power supply that is shipped with every unit.
However, the unit also can be powered by a customer-supplied lithium ion battery. In order to use the
lithium ion battery, the optional battery mount must be ordered.