9
- Via a hose to the “
Overflow
” connection (13), over-
flowing fluid can be directed into a suitable vessel� The
vessel should be positioned lower than the “
Overflow
”
connection
In case of closed external system, if there is in any case
no risk of exceeding the maximum fluid level, you can
close the “
Overflow
” connection with the included
overflow cap� This minimizes the energy loss and pro-
tects, in case of long-term applications with low tem-
peratures and high humidity, against unwanted water
input and the associated volume increase�
Check fluid heat expansion!
- Connect the “
Backflow
” connection (12) to
IKA
calo-
rimeter with a suitable hose�
When
IKA
calorimeter is not connected, please close the
“
Backflow
” connection with included backflow cap�
Inserting battery into the WiCo:
Model: WiCo CBC 5
LPS
IP 40
Model: WiCo CBC 5
LPS
IP 40
Model: WiCo CBC 5
LPS
IP 40
Note:
notch upward!
Model: WiCo CBC 5
LPS
IP 40
Model: WiCo CBC 5
LPS
IP 40
Fig. 7
- Screw the hose olives to the pump connector
IN
and
OUT
with union nuts� Slide the hoses (NW 12) onto the
olives� The hoses must be secured with suitable clamps�
Mounting the WiCo to the station:
Note:
If the
WiCo
need be permanently attached to the sta-
tion, we strictly recommend to fasten the unlocking button
with the integrated screw (turn counter clock wise)�
IKA RC 2 GREEN
control
High
Low
Fluid level
Fig. 8
Filling and draining:
- Before filling the fluid into the bath, open the venting
grid as indicated in following figure�
2 GR
EEN
Fig. 9
Note:
When the external system is not necessary, please
seal the pump connection
IN
and
OUT
with the existing
union nuts and stoppers�
Olives
Union nut
Fig. 5
External
system
IKA
Calorimeter
Fig. 6