![IFM PM16 Series Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/ifm/pm16-series/pm16-series_operating-instructions-manual_4132637011.webp)
11
UK
5.1 G1A Aseptoflex Vario adaptation (PM17xx)
►
Insert the unit with process adapter into the process connection and tighten
using a spanner�
Information about available adapters at www�ifm�com�
►
Observe the instructions of the adapter�
►
Use a lubricating paste which is suitable and approved for the
application�
The unit can be fixed to different process connections�
Options are as follows:
1
Installation using an adapter with sealing ring (hygiene-compliant)
Order no� E332xx / E333xx�
►
To meet the hygiene regulations use a process adapter with leakage
port�
The adapters are supplied with EPDM O-ring (order no� E30054)�
More sealing rings are available as accessories:
• FKM O-ring (order no� E30123)
• PEEK sealing ring (order no� E30124)� The PEEK sealing ring is long-
term stable and maintenance-free�
►
When you replace the PEEK sealing ring or change from a PEEK sealing
ring to an O-ring, the process adapter also needs to be replaced with a
new equivalent adapter�
2
Installation using a welding adapter with sealing ring (hygiene-
compliant)
►
To meet the hygiene regulations use a process adapter with leakage
port�
►
Make sure that the process adapter does not warp during welding� Use
welding mandrel E30452�
►
The sealing edge must not be damaged by subsequent surface
treatment. (→ Instructions in operating instructions of the adapter).
The adapter is supplied with EPDM O-ring (order no� E30054)�
Another sealing ring is available as accessory:
• FKM O-ring (order no� E30123)�