EN
6 - USE AND OPERATION
SIR-52-P/F
6 - Pag. 18 / 24
6.8
PROGRAMMING - PARAMETERS ENTRY
The entering of parameters is necessary to program the automatic cycle of the bar feeder,
according to the working requirements and to the machine type.
For more detailed instructions, see the "Push-button panel operation and instruction manual".
6.9
WORKING DIAMETER CHANGE - OPERATIONS SEQUENCE
The operations for the machining diameter change have to be done on the basis of the previous
machining and in relation to the following machining; see "COMPARATIVE TABLE OF THE
WORKING DIAMETERS" (paragraph 5.3.).
If the stock guide tube diameter has to be replaced, you need to follow the procedure explained
in paragraph 6.9.1; otherwise, follow the procedure explained in paragraph 6.9.2.
DANGER - WARNING:
During the working diameter change operations, do not open the machine doors
when it is running and do not manually turn the lathe spindles when drum guide
is open.
Содержание SIR 52 F
Страница 4: ......
Страница 20: ...EN 2 TECHNICAL INFORMATION SIR 52 P F 2 Pag 12 16 2 6 TECHNICAL INFORMATION ...
Страница 50: ...EN 4 HANDLING AND INSTALLATION SIR 52 P F 4 Pag 22 22 ...
Страница 126: ...EN 8 TROUBLES CAUSES CURES SIR 52 P F 8 Pag 6 6 ...
Страница 127: ...9 PART REPLACEMENT SIR 52 P F EN 9 Pag 1 4 INDEX 1 KEYBOARD BATTERY REPLACEMENT 2 9 2 PLC BATTERY REPLACEMENT 3 ...
Страница 130: ...EN 9 PART REPLACEMENT SIR 52 P F 9 Pag 4 4 ...
Страница 136: ...EN 10 GUIDE CHANNELS BAR PUSHER REVOLVING TIPS SIR 52 P F 10 Pag 6 6 ...
Страница 147: ...11 COLLETS SIR 52 P F EN 11 Pag 11 34 ...
Страница 165: ...11 COLLETS SIR 52 P F EN 11 Pag 29 34 ...
Страница 171: ...12 LIST OF AFTER SALES CENTERS SIR 52 P F EN 12 Pag 1 4 INDEX 12 1 LIST OF AFTER SALES CENTERS 2 ...
Страница 174: ...EN 12 LIST OF AFTER SALES CENTERS SIR 52 P F 12 Pag 4 4 ...