Chapter 1
Introduction
6
www.IDEC.com/software
Operation Flow
Refer to Chapter 2 on page 7
Refer to Chapter 4 on page 34
Refer to Chapter 5 on page 36
Refer to Chapter 3 on page 10
MicroSmart
Software
WindO/I-NV2
PC
Cable
(1) Software
installation
(2) Creating a screen
on the PC
(3) Downloading the project
to the OI
(4) Simulation (operation
verification)
Operator Interface