INSTALLATION 

& SERVICING

HEAT PUMP CYLINDER

CY L I N D E R S

When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance 

specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Ideal Boilers.

For the very latest copy of literature for specification and maintenance practices visit our website www.idealboilers.com 

where you can download the relevant information in PDF format.

GPL006-IU-Iss06-03/20

welcome to our ideology

www.idealboilers.com   | 

welcome to our ideology

www.idealboilers.com   | 

 welcome to our ideology

www.idealboilers.com   | 

welcome to our ideology

www.idealboilers.com   | 

Содержание HP180IND

Страница 1: ...ts that have not been clearly authorised by Ideal Boilers For the very latest copy of literature for specification and maintenance practices visit our website www idealboilers com where you can downlo...

Страница 2: ...heir safety Children should be supervised at all times to ensure they do not play with the appliance This information is provided to assist generally in the selection of equipment Responsibility for s...

Страница 3: ...Valve 6 bar Opening temperature of P T Relief Valve 95 C Energy cut out thermostat setting 85 C Max working pressure Heat pump heat exchanger 3 bar Immersion heater rating 3kW 240V AC All cylinders a...

Страница 4: ...46 43 291 47 334 Pressure regulating valve setting bar 3 3 3 3 Expansion relief valve setting bar 4 5 4 5 4 5 4 5 Temperature setting P T valve C 95 95 95 95 Pressure setting P T valve bar 6 6 6 6 Exp...

Страница 5: ...IH litres 166 186 Weight empty full kg 38 219 40 237 Pressure regulating valve setting bar 3 3 Expansion relief valve setting bar 4 5 4 5 Temperature setting P T valve C 95 95 Pressure setting P T val...

Страница 6: ...Primary return 28mm plain pipe 7 Cold feed 22mm compression 8 Immersion heater 1 BSP 3kW 9 Overheat stat Part G3 loose components supplied in a separate box A Combination inlet group incorporating pr...

Страница 7: ...urn 28mm 7 Primary flow 28mm 8 Overheat stat 9 HP control thermostat Part G3 loose components supplied in a separate box A Combination inlet group incorporating pressure reducing valve strainer check...

Страница 8: ...rate is higher than that of plain tube coil Thecylinderhasbeenspecificallydesignedforheatpumpapplications Itincorporates animmersionheateratthebaseoftheunitwhichenablespasteurisationofthewater This sh...

Страница 9: ...ders are coupled together the secondary inlet and outlet pipes must be balanced The units must be fitted on the same level Note No valves must be fitted between the expansion vessel and the storage cy...

Страница 10: ...ing the hot water cylinder please use MCS guidelines in MIS3005 and also refer to BS EN 806 1 5 AND BS EN 8558 Ideal HP and HP Slimline Model Selection Guide Dwelling type Suggested model Number of be...

Страница 11: ...m s in 42mm 0 10 0 15 0 20 0 25 0 30 0 35 0 40 0 45 0 50 0 55 0 60 0 65 0 70 0 75 0 80 0 85 3 Operating power of heat exchanger suitable for cylinder based on a 5 degree temperature difference kW 5K...

Страница 12: ...eofshowermixingvalve can be used as long as both the hot and cold supplies are mains fed However all mains pressure systems are subject to dynamic changes particularly when other hot and cold taps sho...

Страница 13: ...he discharge be of metal and a Be at least one pipe size larger than the nominaloutletsizeofthesafetydeviceunless its total equivalent hydraulic resistance exceeds that of a straight pipe 9m long i e...

Страница 14: ...rsareused AllpartsareavailabletoapprovedinstallersfromIdealBoilers Combination Inlet Group Combines elements 1 2 and 3 below 1 PressureReducingValve Thecoldwatersupplytoanymixertaps showersmustbetaken...

Страница 15: ...s electricity supply at the fuse spur unit INSTALLATION INSTALLATION The immersion heater thermostats incorporate a manual reset safety overheat cut out thermostat Should this operate investigate the...

Страница 16: ...4 the following should also be taken into account during the design and installation phase The heat pumps normally operate at lower flow temperatures typically 45 55 C compared with 75 80 C for the bo...

Страница 17: ...ss ATL option Cable 3 x 0 5 mm Electrical backup power supply see heat pump manual General power supply see heat pump manual Electrical Board or or or or 1 2 3 L N X11 EX3 Commun Ferm Ouvert X15 X86 X...

Страница 18: ...the disinfection procedure Damage caused through a failure to do this adequately will not be covered by the warranty For the above reasons we recommend the use of a non chlorine dased disinfectant su...

Страница 19: ...mperature and expansion relief valves are free from obstruction and blockage and are not passing any water 5 Check the condition and if necessary descale the heat exchangers in hard water areas 6 Chec...

Страница 20: ...at source is electrical ensure that the immersion heaters are isolated from the mains before re setting the energy cut out If the immersion heater s need replacing this should be done with the units s...

Страница 21: ...re set at 45 C 50 C Has high limit cut out Re set END YES YES YES YES YES YES YES NO NO NO NO NO NO NO FAULT Poor Water Flow at Hot Taps Water service check by supply company required Clean or replace...

Страница 22: ...ERV TPRV Replace PRV END START Is pressure downstream of pressure reducing valve correct Is valve seal and seat clean undamaged Is heater operating at less than 60 C Re set temperature NO YES YES NO...

Страница 23: ...n 1 180996 3 Lift up pressure and temperature relief valve 6 bar 95 C 1 180999 4 Inlet group set at 3 bar c w expansion relief valve set at 4 5 bar 1 176750 5 18 litre expansion vessel 1 176752 6 24 l...

Страница 24: ...tourbridge West Midlands DY8 1PA TELEPHONE 01384 442611 FAX 01384 442612 Water Savings Water Related Costs Can Be Reduced By Good Plumbing Practice TAPS MIXERS SHOWERS Unregulated 25 30 l m Regulated...

Страница 25: ...lead for team lifts As more than one person is required for these products ensure that one person is taking the lead This may be you so ensure that each person that is helping is made aware of the we...

Страница 26: ...uct and will collect and deliver to any address in England Scotland and Wales excluding all islands Our normal working times excluding Bank Holidays are 8am 6pm Monday to Friday 8am 4pm Saturday 8 00a...

Страница 27: ...Page 27 NOTES...

Страница 28: ...te will then be issued to the customer Heating and Hotwater Industry Council HHIC www centralheating co uk demonstrating compliance with the appropriate Building Regulations and then handed to the cus...

Страница 29: ...me Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date...

Страница 30: ...issioning servicing of central heating systems Ideal Boilers Ltd PO Box 103 National Avenue Kingston Upon Hull HU5 4JN Tel 01482 492251 Fax 01482 448858 Registration No London 322 137 Ideal Technical...

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ...the system stabilises This is quite normal with these types of systems and does not indicate a fault In some areas the water will initially appear cloudy but will quickly clear when left to stand This...

Страница 35: ...HEAT PUMP CYLINDER USER GUIDE USER GUIDE...

Страница 36: ...n clearly authorised by Ideal Boilers For the very latest copy of literature for specification and maintenance practices visit our website www idealboilers com where you can download the relevant info...