IDEAL 61-520 Скачать руководство пользователя страница 1

OPERATING

INSTRUCTIONS

PHASE SEQUENCE

AND OPEN PHASE

INDICATOR

#61-520

HOW TO CHECK PHASE SEQUENCE (cont’d)

Fig. 3

IDEAL INDUSTRIES, INC.

Sycamore, IL 60178, U.S.A.
800-435-0705 Customer Assistance
www.idealindustries.com

ND-1714-2

PLEASE READ 

CAREFULLY

Misuse and abuse of
these instructions can-
not be prevented by any
printed word and may
cause injury and or
equipment damage.
Please follow these
instructions faithfully and
adhere to all standard
industry safety rules.

Shown Approx.

1/3 Actual Size

WARRANTY STATEMENT

This  tester  is  warranted  to  the  original  purchaser  against  defects  in
material and workmanship for two years from the date of purchase.
During  this  warranty  period,  IDEAL  INDUSTRIES,  INC.  will,  at  its
option,  replace  or  repair  the  defective  unit,  subject  to  verification  of
the defect or maltifunction. This warranty does not cover fuses, bat-
teries or damage from abouse, neglect, accident, unauthorized repair,
alteration, or unreasonable use of the instrument.

Any  implied  warranties  arising  out  of  the  sale  of  an  IDEAL  product,
including but limited to implied warranties of merchantebility and fit-
ness for a particular purpose, are limited to the avobe. The manufac-
turer shall not be liable for loss of use of the instrument or other inci-
dental or consequential damages, expenses, or economic loss, or for
any claim or claims for such damage, expenses or economic loss.

State laws vary, so the above limitations or exclusions may not apply
to you. This warranty gives you specific legal right, and you may also
have other rights which vary from state to state.

IDEAL INDUSTRIES INC.

Attention: Repair Dept.

1000 Park Ave.

Sycamore, IL 60178

1

The warranty is not applicable if the instrument has been misused,

abused, subjected to loads in excess of specifications, has had unau-
thorized repair or has been improperly assembled or used.

6. If the rotation of the disc is COUNTER-CLOCKWISE

,release

'ON' button and transpose 

(

interchange

the connections of any

two clips to the lines.

7. Press the 'ON' button again, making certain that all 3 lamps are lit

(

no open phases

)

, and check direction of the rotating disc, which

will be CLOCKWISE       .

Release 'ON' button at end of test.

5. If all 3 lamps are lit, check the direction of the

rotating disc on the front panel. If it is in a
CLOCKWISE  direction       ,  the  Phase  Se-
quence is R, S, and T, in order of the lines
where the Red, White and Blue clips are con-
nected.
Release the 

'ON' 

button at conclusion of test.

Отзывы: