KERS 50
–
Heat recovery ventilation unit
–
User & installation manual
© Ideal Clima
–
Page 22 / 28
Cable entry can take place as shown, both on the back side that the bottom side of the device.
Insert the cartridge into the air duct as figured below. The pointer must be directed upwards.
Then fix the wire with the protruding clamp and connect the socket connector to the circuit board.
Install the front panel taking care that the actuator pin completely retracted at the bottom, to prevent any
damage to it.
9.5
FIRST START-UP
Kers will not start if the front panel is hermetically sealed. Gently pull toward you to open it using the handle
located on the top and bottom of the device. A 5-mm opening will be enough.
Содержание KERS 50
Страница 1: ...KERS 50 SINGLE ROOM HEAT RECOVERY UNIT WITH REMOTE CONTROL 16 USER INSTALLATION MANUAL ...
Страница 26: ...KERS 50 Heat recovery ventilation unit User installation manual Ideal Clima Page 26 28 ...
Страница 27: ...KERS 50 Heat recovery ventilation unit User installation manual Ideal Clima Page 27 28 ...