KERS 50
–
Heat recovery ventilation unit
–
User & installation manual
© Ideal Clima
–
Page 19 / 28
9.3
EXPLODED VIEW OF THE COMPONENTS
Assembly drawing
Central body
9.4
WALL MOUNTING
Hole preparation
Drill a hole through the wall with diameter min. 162 mm, inclined outwardly between 2° and 3°.
Telescopic duct insertion
When several KERS are installed in series (see separate section) it is necessary to allow for connecting wires
between a KERS and the others, as well as for the power wire.
The duct must be level with the inside wall (maximum 3 mm overhang) and should protrude from the outdoor
wall for up to 10 mm.
Keep an inclination towards the outside between 2° and 3° to prevent possible condensation could from flow
inward.
Fill the space between the duct and wall hole with insulation material, e.g. with polyurethane foam.
Содержание KERS 50
Страница 1: ...KERS 50 SINGLE ROOM HEAT RECOVERY UNIT WITH REMOTE CONTROL 16 USER INSTALLATION MANUAL ...
Страница 26: ...KERS 50 Heat recovery ventilation unit User installation manual Ideal Clima Page 26 28 ...
Страница 27: ...KERS 50 Heat recovery ventilation unit User installation manual Ideal Clima Page 27 28 ...