ICS Schneider Messtechnik induQ IVMZ.2 Series Скачать руководство пользователя страница 7

 — 

IVMZ

.2 

Construction and function 

Technical changes reserved 

- 7 -

3  Construction and function 

Components: 

Housing:

The Housing consists of plastic and has the

IP65 degree of protection.

Electrical connection:

The electrical connection is made via 4-pin

plug M12x1.

Process connection:

The process connections are available in

different sizes.

Operation / flow indicator LED.

Construction:  

The measuring tube with its earthing sleeves and electrodes passes 

through the housing and forms the external process connection of 

the 

IVMZ

.2.  

A magnetic field for the measurement process is generated inside the 

housing, which also contains the sensor and signal conditioning cir-

cuitry.  
The two stainless steel electrodes are located in the middle of the 

measuring tube between the earthing sleeves.  
The 

IVMZ

.2 does not need any moving parts to make measurements. The inside of the 

meas-uring tube is completely open, allowing the fluid to flow unhindered through the 

measuring tube. 

Function: 

The magnetic inductive flow sensor functions according to the induction principle. A DC volt-

age is generated by the movement of a conductor in a magnetic field: 
The measuring tube of the 

IVMZ

.2 is located in a 

mag-netic field (B). 
An electrically conductive medium (V) flows through 

the measuring tube. The positive and negative charge 

carriers are oppositely deflected. 
A voltage (U) is generated at right angles to the mag-

netic field, which is picked up by the two electrodes.  

Thereby, the induced voltage is proportional to the av-

erage flow velocity of the liquid. 
The electronics of the 

IVMZ

.2 converts the induced 

voltage into a flow-proportional frequency signal. 

Содержание induQ IVMZ.2 Series

Страница 1: ...Magnetic Inductive Flow Sensor Series IVMZ 2 Types VMZ03 VMZ06 VMZ08 VMZ15 VMZ20 VMZ25 Operating manual Operating manual page 1 20...

Страница 2: ...function 7 4 Installation of IVMZ 2 8 4 1 Installation instructions 9 4 2 Assembly 10 5 Electrical connection 11 5 1 Wirings 12 6 Commissioning and measuring operation 13 6 1 Commissioning 13 6 2 Swi...

Страница 3: ...fects or cause considerable damage to property CAUTION Electric current This sign indicates dangers which could arise from handling of electric current CAUTION Material damage This sign indicates acti...

Страница 4: ...e been carefully checked for their operational reliability before shipment Immediately after receipt please check the outer packaging for damages or any signs of improper handling Report any possible...

Страница 5: ...re that the measuring tube of the IVMZ 2 is always completely filled 4 1 Installation instructions Ensure that the conductivity of the fluid is at least 20 S cm 1 3 Exclusion of liability We accept no...

Страница 6: ...g national regulations for accident prevention and safety in the workplace must be complied with Any internal regulations of the operator must also be complied with even if these are not mentioned in...

Страница 7: ...the middle of the measuring tube between the earthing sleeves The IVMZ 2 does not need any moving parts to make measurements The inside of the meas uring tube is completely open allowing the fluid to...

Страница 8: ...alling check that the wetted materials of the device are suitable for the media being used 9 2 Materials table the equipment is switched off and is in a safe and de energised state the equipment is de...

Страница 9: ...rs are widely independent from the flow profile An inlet section is not necessary To reach a most highly accuracy of the measurement you should use straight inlet and outlet sections according to the...

Страница 10: ...irt deposits Install the appropriate screwed connections at the installation location Insert the IVMZ 2 together with the gaskets Screw the union nuts of the screwed connection onto the pro cess conne...

Страница 11: ...AUTION Electric current The electrical connection should only be carried out by a fully qualified electrician De energize the electrical system before connecting the IVMZ 2 Connection cable Suitable c...

Страница 12: ...ype plate Supply voltage IVMZ 2 with frequency output Push Pull NPN Open Collector PNP Open Collector 1 Push Pull switching outputs of several IVMZ 2 may not be connected in parallel 2 Recommendation...

Страница 13: ...Switch on the supply voltage The green LED lights up The IVMZ 2 is ready and goes into measuring mode 6 3 Measuring operation In the measuring mode the green LED flashes proportional to the measured...

Страница 14: ...vices If necessary the customer must neutralise or purge the unit before return Costs incurred due to inadequate cleaning of the device and possible costs for disposal and or personal injuries will be...

Страница 15: ...ised state the equipment is depressurised and has cooled down Disassembly Remove the electrical connectors Remove the IVMZ 2 using suitable tools Disposal Compliant with the Directives 2011 65 EU RoHS...

Страница 16: ...eristics Frequency output Pulse rate K Factor pulses l 10 000 4000 1000 400 200 80 Resolution ml pulse 0 1 0 25 1 0 2 5 5 0 12 5 Signal shape Square wave signal duty cycle 50 50 Push Pull NPN open col...

Страница 17: ...ure 15 60 C Storage temperature 15 60 C Nominal diameter DN 3 DN 6 DN 8 DN 15 DN 20 DN 25 Inner diameter 3 mm 8 x 2 mm 8 mm 14 mm 18 mm 25 mm Max working pressure at C 10 bar 20 C 8 bar 40 C 6 bar 60...

Страница 18: ...nsions IVMZ 2 DN 3 DN 6 DN 8 DN 15 DN 20 VMZ06 Type L1 L2 D1 D2 VMZ03 85 13 G B 3 VMZ06 85 13 G B 8 x 2 VMZ08 85 13 G B 8 VMZ15 90 16 G B 14 VMZ20 90 16 G1 B 18 IVMZ 2 DN 25 L1 58 M12x1 13 5 D2 89 36...

Страница 19: ...IVMZ 2 Technical changes reserved 19 For your notes...

Страница 20: ......

Отзывы: