
Installation of
IVMZ
.2
—
IVMZ
.2
- 10 -
• Ba_
IVMZ
.2_en • 06a/2021
4.2 Assembly
The
IVMZ
.2 is installed directly into the pipeline. The compact design and lightweight of
the unit make wall mounting unnecessary.
IMPORTANT NOTICES:
• Only use suitable gaskets for installation.
• Observe the flow direction indicated on the type plate.
• Observe the mounting dimensions (
§ 9.3 “Dimensions”).
Select an appropriate location for installation
§ 4.1 “Installation instructions”).
To ensure the best possible measuring accuracy, a vertical
installation position with increasing flow is preferable (no col-
lecting of dirt deposits).
Install the appropriate screwed connections at the installation
location.
Insert the
IVMZ
.2 together with the gaskets.
Screw the union nuts of the screwed connection onto the
pro-cess connections of the
IVMZ
.2.
Ensure that an air gap remains between the union nut and
the housing. If the union nuts are screwed right up to the
housing, the
IVMZ
.2 may be damaged.
Maximum torque
I
VMZ03
I
VMZ06/08
I
VMZ15
I
VMZ20
I
VMZ25
POM
PVDF
POM
PVDF
POM
PVDF
POM
PVDF
POM
PVDF
3 Nm
3 Nm
3 Nm
4 Nm
5 Nm
6 Nm
6 Nm
8 Nm
17 Nm 22 Nm
Tighten both union nuts with the maximum torque.
CAUTION! Material damage!
Pay attention to maximum torque.
While tightening, counter the
I
VMZ.2 only by hand!
If you use an open-end or a pipe wrench, the
I
VMZ.2 can
be damaged.
Air gap
required
Air gap
required
Содержание induQ IVMZ.2 Series
Страница 19: ...IVMZ 2 Technical changes reserved 19 For your notes...
Страница 20: ......