background image

Содержание PYPA Series

Страница 1: ...TIONAL TABLEOF CONTENTS 1 SAFETYLABELINGANDSIGNAL WORDS 2 2 UNITDIMENSIONS 2 3 SAFEINSTALLATIONREQUIREMENTS 2 4 LOCATINGTHE UNIT 2 5 UNITELECTRICALWIRING 4 6 ELECTRICHEATINSTALLATIONGENERALINFORMATION 6 7 AIR DISTRIBUTIONSYSTEM 8 8 START UPPROCEDURES 8 9 SEQUENCEOF OPERATION 10 Printed in U S A LP 1 10 15 01 427 01 1005 00 ...

Страница 2: ...on a concrete slab of 48 1219mm x 48 1219mm dimensions Cement blocks on a 3 sand footing will also work The slab or blocks SHOULD NOT be in contact with any part of the structure Check local codes covering zoning noise platforms etc If practical avoid locating next to fresh air intakes vent or bed room windows Noise may carry into the openings and disturb people inside Avoid installations under ro...

Страница 3: ...The platform may be made of either concrete or pressure treated wood and MUST be level and strong enough to support the unit s weight Position platform separate from the building s foundation Install in a well drained area with the top surface of the platform above grade level and above the average winter snow levels to prevent coi blockage Platform MUST be high enough to allow for proper conden s...

Страница 4: ...the heater box Field supplied line voltage wires for the Electric Heat Accessory separate from the field supplied line voltage wires to the unit connect to the appropriate circuit break er if used in the Electric Heat Accessory Converting 230V Units to 208V To convert 230V units to 208V 1 Turn electric power OFF 5 Unit Electrical Wiring 2 Remove the blower electrical access panel 3 Locate the 24V ...

Страница 5: ...gramL W Voltage Wi ri ng NQT Typical Thermostat Subbase ES Common maybe B or X on some T stats W may be W2 on some T stats I I I I I I I I where used W2 Orange _ XX Com Fan 24V Com Elect When outdc or when Hot pressor Heat thermostat is used Acces used route this I Reversing valve energized in cooling c I i I I I I I I I I A A A A A I I I I I I Blue Green F_ed Y_llow White Unit Low Voltage Wiring ...

Страница 6: ... simplify wir ing of heaters 3 From inside the blower compartment remove the six screws on the heater cover plate and save the screws Discard the heater cover plate The screws will be used later to mount the electric heat ac cessory and its cover 4 Remove the cardboard wrapper from the heater s elements 5 Insert the heater into the heater blower box Exercise cau tion to prevent damage to heater el...

Страница 7: ...w volt wire harness in the control box 8 Connect the grey wire from the heater wire harness to the blue wire from the unit 24V common F GU E io Typical Wiring Installation Unit Line Voltage Wires Knockout Ground Lug Access hole for low voltage Knockout for unit field supplied line voltage wires 31 10 16 Heater Ground Lug FIGURE 11 HEATER MODEL AMMH 0AHB withfuses AMMH 5AHB withfuses Accessory Elec...

Страница 8: ...er sizing and installation to Mobile Homes and other standard construction Ductwork Insulation It is recommended that ductwork installed outdoors have a mini mum of 2 51 mm of fiberglass insulation and be covered by a weatherproof vapor barrier that is protected against damage Caulking and flashings or other means adequate to provide a permanent weather seal must be used It is recommended that duc...

Страница 9: ... NOTE The speed taps that the manufacturer sets from the facto ry for this product are based on a nominal 400 CFM per ton cool ing and the basic mid range on the temperature rise for heating Since the manufacturer cannot establish the static pressure that will be applied to the unit it is the responsibility of the installing dealer contractor to select the proper speed taps for the applica tion wh...

Страница 10: ...rost Control Board has a jumper plug that can be set at 30 60 90 or TEST Remove the plug and insert on the appropriate 2 pins indicated by on the board FIGURE 1I Defrost Control Board Jumper Plugs 1 j Jumper Plugs 4 Set the thermostat temperature setting as high as it will go 9 Sequence of Operation 5 Turn electric power ON 6 Operate unit AT LEAST 5 minutes then check temperature rise NOTE The max...

Страница 11: ... ex cept as required by thermostat To check out the defrost mode place jumper across the two tabs marked DF This simulates the defrost sensor clos ing The delay can be by passed by jumpering the test pins on the defrost control board this reduces the delay from 30 minutes to 7 seconds from 60 minutes to 14 seconds and from 90 minutes to 21 seconds In the defrost mode the reversing valve will energ...

Страница 12: ... COLORCODE _LACK SK GREEN G _ _TE W __ LINE VDLiADE _iELD _LUE BL ORANGE 0 YELLOW Y LOW 0 TAOE FACTORY _ROW_ _R RED __ __ t OW Oi TAOE FIELD GRAY GY VIOLET 0835 _ 7 LADDER WIRING DIAGRAM DANGER ELECTRICAL SHOCK HAZARD DISCONNECT POWER BEFORE SERVICING 3_I GND L2 LI 208 230 VAC 6B HZ 3PH OPTIONAL CRANKCASE HEATERL_v_ _I_ L3 _J _ HEATER PKG WHEN USED 0 II_ANS RANSFDOMER COMPR_ CO_PRESROR EAD CAPACit...

Страница 13: ... Warranty DOES NOT COVER any labor material refractory chambers oii nozzles refrigerant refrigerant inspection and refrigerant reclaiming freight and or handling charges associated with any repair or replacement and such charges will be your responsibility Toestablish the installation date for any purpose under this Limited Warranty you must retain the original records that can establish the insta...

Страница 14: ...2 CAC4 KAC0 TCA0 TCA2 TCA4 HHP0 HHP2 HHP4 CliP0 CliP2 CliP4 TCH0 TCH2 TCH4 PGME PYMC PHAD PGAD PA95 PAPC PAK APK Tothe original purchaser a replacement for 10 years from original date of installation only if the unit is installed with factory matched coils except air conditioner condensing units with a nominal SEER of 10 may be matched with evaporator coils of the same nominal tonnage regardless o...

Отзывы: