
440 01 2021 01
2
START--UP CHECK SHEET
For 90+ Furnace
(Keep this page for future reference)
Dealer Name
:
Address
:
Business Card Here
City, State(Province), Zip or Postal Code
:
Phone
:
Owner Name
:
Address
:
City, State(Province), Zip or Postal Code
:
Model Number:
Serial Number:
Type of Gas:
Natural:
LP:
Which blower speed tap is used?
High Fire
Low Fire
or (Cooling)
For variable speed models (*9MPV), What dip switches are
selected?
High Fire
Low Fire
or (Cooling)
Temperature of Supply Air: High Fire (
°
F)
or (
°
C)
Low Fire (
°
F)
or (
°
C)
Temperature of Return Air:
(
°
F)
or (
°
C)
Temp. Rise Hi Fire (Supply -- Return ): (
°
F)
or (
°
C)
Lo Fire (Supply -- Return ): (
°
F)
or (
°
C)
Filter Type and Size:
Fan “Time
ON
” Setting:
Fan “Time
OFF
” Setting:
Manual Gas Shut--Off Upstream
of Furnace/Drip--Leg?
YES
NO
Condensate Drain Connected? YES
NO
Condensate Drain Trapped? YES
NO
Transition Pressure switch hose relocated for U/D/H
Application? YES
NO
Blower Speed Checked? YES
NO
All Electrical Connections Tight? YES
NO
Gas Valve turned ON? YES
NO
Measured Line Pressure When Firing Unit:
Calculated Firing Rate:(See
Checks and Adjustments
Sec-
tion). (Lo)
& (Hi)
Temperature Rise (supply--return temperature):(
°
F)
Measured Manifold Gas Pressure: (Lo)
& (Hi)
Static Pressure (Ducts): Supply Air
Return
Date of Start--Up:
CO ?
CO2 ?
Dealer Comments:
Содержание *9MPT050F12
Страница 48: ...440 01 2021 01 48 ...