SUPERVISOR SETUP MANUAL
Revision: 005
35
August, 2011
Step 5
Type the server start port in the Server Start Port box. The default
server start port is the TCP port number that PC Loader and
Evidence Loader use for TCP communications. The default server
start port is 32032.
Step 6
Type the number of ports in the Number of Ports box. The default
number of TCP ports available for uploading is 10.
Note: Unless directed otherwise, ICOP recommends having the server start
port set to 32032, and the number of ports set to a maximum of 10
ports.
Step 7
Click OK to save the server settings.
Automatically Shutting Down the Computer after Wireless Upload
The Shut Down Computer Automatically option allows you to shut down the
computer after completing a wireless upload.
To automatically shut down the computer after wireless upload, complete
the following steps:
Step 1
Select the Shut down computer automatically checkbox.
Step 2
Select the Shut down computer after upload completes
checkbox.
Note: After completing a wireless upload, both the computer and
DVR will shut down.