
INSPECTIONS / CONDITION INSPECTIONS AND 100-HOUR INSPECTIONS
3-9
CHANGE C2
ICON A5 / MAINTENANCE MANUAL
CHA
P
TER
3
3.3
Condition Inspections and 100-Hour Inspections
This task includes the checklists that must be completed to accomplish a Condition Inspection or to
accomplish a 100-Hour Inspection. The inspection is complete when all rows of the checklist contain
inspector’s initials in either the Satisfactory (“S”) or Unsatisfactory (“U”) column and the bottom of the
checklist is signed. A row filled out with a satisfactory result indicates that the inspection did not
uncover any unairworthy condition—though a statement in the comments section may indicate recom-
mended improvements or maintenance that may be deferred. A row filled out with an unsatisfactory
result indicates an unairworthy condition.
After completion of the inspection, the result is entered into the Aircraft Logbook—either as passing
airworthy or as unairworthy. An airworthy aircraft may be returned to service. All unairworthy inspec-
tion issues must be corrected prior to returning the aircraft to service.
All data related to unairworthy inspection issues is entered into the ICON Service Request form.
Contact ICON owner support if a copy of the form is needed.
Type of Maintenance
Line
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
Fuel Sumping Tool—ICA009753
Jack Adapters (2)—ICA009750
Engine Compression Tester
Battery Load Tester
Digital level (inclinometer) with 0.1° resolution
Parts Required
None
R
ELATED
I
NFORMATION
:
"Introduction" on page 3-3
"Interval Maintenance—Operational Hours" on page 3-4
"Interval Maintenance—Calendar Intervals" on page 3-5
"Overhaul Maintenance" on page 3-8
Содержание A5
Страница 4: ...IV TABLE OF CONTENTS ICON A5 MAINTENANCE MANUAL ISSUE C3...
Страница 112: ...3 60 INSPECTIONS SYSTEM SPECIFIC INSPECTIONS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 3...
Страница 126: ...4 14 STRUCTURES USE OF VHB TAPE FOR INSTALLATIONS AND REPAIRS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 4...
Страница 137: ...ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS 6 9 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 6...
Страница 138: ...6 10 ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 6...
Страница 139: ...ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS 6 11 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 6...
Страница 141: ...ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS 6 13 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 6...
Страница 151: ...ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS 6 23 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 6...
Страница 152: ...6 24 ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 6...
Страница 156: ...6 28 ELECTRICAL SYSTEM ELECTRICAL SYSTEM WIRING DIAGRAMS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 6...
Страница 342: ...9 106 FLIGHT CONTROLS YAW CONTROLS ICON A5 MAINTENANCE MANUAL CHANGE C3 CHAPTER 9...
Страница 398: ...11 20 FUSELAGE AND VERTICAL TAIL WATER RUDDER ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 11...
Страница 420: ...12 22 HORIZONTAL TAIL HORIZONTAL TAIL TIP PIN ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 12...
Страница 425: ...INSTRUMENTS AND AVIONICS TROUBLESHOOTING 13 5 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 13 2 Left Crossbeam...
Страница 508: ...13 88 INSTRUMENTS AND AVIONICS PITOT STATIC ANGLE OF ATTACK AOA SYSTEM ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 13...
Страница 512: ...14 4 LANDING GEAR DIAGRAM SCHEMATIC ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 14 14 2 Diagram Schematic...
Страница 608: ...14 100 LANDING GEAR AFT NOSE LANDING GEAR DOOR ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 14...
Страница 624: ...15 16 PLACARDS AND MARKINGS PLACARDS AND MARKINGS GENERAL MAINTENANCE ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 15...
Страница 627: ...PROPULSION 16 3 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 16 Install Spinner Dome 16 106...
Страница 658: ...16 34 PROPULSION ENGINE ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 16 FIGURE 16 20...
Страница 659: ...PROPULSION ENGINE 16 35 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 16 THROTTLE ASSEMBLY...
Страница 732: ...16 108 PROPULSION PROPELLER ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 16...
Страница 788: ...19 4 ICON PARACHUTE SYSTEM IPS DIAGRAM SCHEMATIC ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 19 19 2 Diagram Schematic...
Страница 822: ...19 38 ICON PARACHUTE SYSTEM IPS ACTIVATION SYSTEM ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 19...