SC MAINTENANCE
•
After that, open the drainage faucet, or empty the water bin. By doing so the solution
will be diluting, with the water pump on and the inlet water faucet open.
•
After 10 minutes, stop the unit and close the inlet water faucet. Wait until the whole
unit is completely drained.
•
Once the unit is drained, close the drainage faucet and open the inlet water faucet.
•
Before connection the unit, please reconnect the cold production. To do so access the
electric box again and connect the cable to the terminal #6.
•
Connect the unit to the electricity. Produce ice for 5 minutes.
CAUTION: Discard the ice produced during this time.
•
After this time, the unit can be used normally.
Exterior cleaning
•
Disconnect the unitfrom electricity and close the water inlet.
•
Use a cloth with a degreasing detergent.
•
Apply 3 in 1 on the surface to leave a protective film.
6.
MAINTENANCE TABLE:
MAINTENANCE TASK
Dusty environment
Normal
environment
Saline environment
Air condenser cleaning
6 months
12 months
6 months
Cleaning inside evaporator.
6 months
6 months
3 months
MAINTENANCE TASK
Agua dura (mayor
400ppm)
Agua normal (menor
400ppm)
Brine
Water filter replacement
6 months
12 months
6 months
Hydraulic circuit cleaning
6 months
12 months
Rinse with mains water after each
prolonged shutdown (+12h).
Exterior cleaning
6 months
12 months
6 months
Sanitary cleaning
6 months
6 months
6 months
Evaporator interior cleaning.
3 months
6 months
3 months
During the maintenance visit, check the connections on the electric board.