5.1. Preliminary checks
a) Is the machine levelled?
b) Are voltage and frequency of mains supply the same as indicated on rating plate?
c) Is drainage system working properly?
d) Is air circulation and room temperature adequate? (Air
AMBIENT TEMPERATURE
MAXIMUM
43° C
MINIMUM
5° C
e) Is water pressure adequate?
MAXIMUM
0.7 Kg/cm2
MINIMUM
6 Kg/cm2
ATENTION: Check that voltage and mains frequency is the same as in the rating plate.
5.2. Starting up
Once preliminary check has been
proceed as follows:
1. Open water faucet. Check for leaks.
2. Plug machine into electricity mains supply.
3. Ensure that there are no strange vibrations or scraping sounds
4. Check that the water curtain moves freely
5. At the cycle’s end, there should be frost forme don the compressor inlet tuve except for the
last 50 mm.
ICE TECH PS Technical Service Manual
voltage and frequency of mains supply the same as indicated on rating plate?
c) Is drainage system working properly?
d) Is air circulation and room temperature adequate? (Air-cooled models)
WATER TEMPERATURE
35° C
5° C
e) Is water pressure adequate?
0.7 Kg/cm2
6 Kg/cm2
Check that voltage and mains frequency is the same as in the rating plate.
Once preliminary check has been completed (ventilation, connections, temperature, etc.),
Open water faucet. Check for leaks.
Plug machine into electricity mains supply.
Ensure that there are no strange vibrations or scraping sounds
curtain moves freely.
At the cycle’s end, there should be frost forme don the compressor inlet tuve except for the
Technical Service Manual
voltage and frequency of mains supply the same as indicated on rating plate?
cooled models)
Check that voltage and mains frequency is the same as in the rating plate.
completed (ventilation, connections, temperature, etc.),
At the cycle’s end, there should be frost forme don the compressor inlet tuve except for the