Granular Ice Technical Service Manual
29
COD: IQ02_404MTIN.DOC
Procedure:
1) Disassemble gearbox (see previous section)
2) Remove all four screws holding brackets.
3) Remove all three screws that keep plate and evaporator together.
4) Remove gearbox by hand or using extractor.
Assembly:
1) Clean lodging and neck plate.
2) Mount plate.
IMPORTANT:
End of ice discharge flap must be to the right of evaporator's window.
IMPORTANT:
Carefully lubricate seal lips (depending on model), avoid damaging them.
1) Replace the three evaporator/plate screws.
2) Replace brackets.
3) Reassemble gearbox. (see previous section)
7.4. Upper bearing (depending on the model)
Materials needed:
▪
Extractor
▪
PHILLIPS N°2 Screwdriver
▪
M8 Screws (110 mm)
▪
No.12-13 monkey wrench (2)
▪
No.8-9 monkey wrench
▪
4, 5 and 6 mm Allen key
▪
M8 nuts (2)
1) Disassemble gearbox (see previous sections)
2) Disassemble plate/flange (see previous section)
3) Remove top seals.
4) Place and fix extracting ring.
5) Strike chisel placed over extracting ring using nylon head hammer.
Assembly:
1) Install new seals and lubricate
2) Secure bearing.
3) Mount plate.
IMPORTANT:
Be careful not to damage seals. Lubricate seal lips with grease.
Содержание CD 50
Страница 5: ...Granular Ice Technical Service Manual 5 COD IQ02_404MTIN DOC 1 4 Electric diagrams ICETECH CD 90...
Страница 6: ...Granular Ice Technical Service Manual 6 COD IQ02_404MTIN DOC ICETECH GR 560 TRIFASIC...
Страница 7: ...Granular Ice Technical Service Manual 7 COD IQ02_404MTIN DOC ICETECH GR 560 SPLIT...
Страница 8: ...Granular Ice Technical Service Manual 8 COD IQ02_404MTIN DOC ICETECH CD 50...
Страница 9: ...Granular Ice Technical Service Manual 9 COD IQ02_404MTIN DOC ICETECH GR 400 560...