AI MDVR Installation and debug manual
6
special calibration tool
3.
Site required for installation
Make sure that the vehicle is parked stably on a flat ground. It is
better to have a road convenient for testing near the installation site.
III.
Installation steps
1.
Wiring
a.
Wiring topology diagram, as shown in the figure:
Wiring topology
b.
Wiring method
A total of 5 wires (required): power +, power -, ACC, left turn, right
turn;
Brake signal (optional);
Method: Connect the electrical signal of the body to open the panel of
the car, use a multimeter or an electric pen to find the power supply VCC,
ignition signal ACC, GND and left turn signal line and right turn signal
line and connect them.
Connect the DSM camera to the first channel CAM1/DSM of the host (display
the first channel)