About
This
Publication
This
publication
is
intended
for
system
planners,
installation
managers,
and
other
technical
support
personnel
who
need
to
plan
for
operating
in
logically
partitioned
(LPAR)
mode
on
the
IBM
System
z9
Enterprise
Class
(z9
EC)
and
IBM
System
z9
Business
Class
(z9
BC).
This
publication
assumes
previous
knowledge
of
the
characteristics
and
functions
of
the
installed
central
processor
complex
(CPC).
To
improve
readability,
we
refer
to
the
different
CPCs
using
the
following
terminology
whenever
possible:
Table
1.
Terminology
Used
in
This
Publication
Terminology
Central
Processor
Complex
(CPC)
z9
BC
IBM
System
z9
Business
Class
Model
R07
Model
S07
z9
EC
IBM
System
z9
Enterprise
Class
Model
S08
Model
S18
Model
S28
Model
S38
Model
S54
Some
features,
panels,
and
functions
are
model-dependent,
engineering
change
(EC)
level-dependent,
machine
change
level-dependent
(MCL-dependent),
or
control
program-dependent.
For
this
reason,
not
all
of
the
functions
discussed
in
this
publication
are
necessarily
available
on
every
CPC.
Sample
tasks
and
panels
explained
in
this
publication
reference
tasks
and
panels
available
from
the
support
element
console.
However,
detailed
procedures
for
operator
tasks
and
accurate
task
and
panel
references
are
explained
in
the
Support
Element
Operations
Guide
.
Some
illustrations
and
examples
in
this
publication
describe
operation
with
as
few
as
2
logical
partitions
(LPs),
although
up
to
60
LPs
can
be
defined.
Hardware
Management
Console
operators
or
support
element
console
operators
should
use
the
appropriate
operations
guide
for
instructions
on
how
to
perform
tasks.
Control
program
operators
should
refer
to
the
appropriate
control
program
publication
for
information
on
control
program
commands.
For
information
about
PR/SM
™
LPAR
mode
on
prior
models,
see
the
following
publications:
v
System
z9
109
Processor
Resource/Systems
Manager
Planning
Guide
,
SB10-7041-00
v
zSeries
890
and
990
Processor
Resource/Systems
Manager
Planning
Guide
,
SB10-7036
v
zSeries
800
and
900
Processor
Resource/Systems
Manager
Planning
Guide
,
SB10-7033
v
S/390
®
Processor
Resource/Systems
Manager
Planning
Guide
,
GA22-7236
©
Copyright
IBM
Corp.
2005,
2008
xvii
Содержание Z9
Страница 1: ...System z9 Processor Resource Systems Manager Planning Guide SB10 7041 03...
Страница 2: ......
Страница 3: ...System z9 Processor Resource Systems Manager Planning Guide SB10 7041 03...
Страница 12: ...x PR SM Planning Guide...
Страница 18: ...xvi PR SM Planning Guide...
Страница 26: ...xxiv PR SM Planning Guide...
Страница 43: ...ZVSE ZVM Figure 1 1 Characteristics of Logical Partitions Chapter 1 Introduction to Logical Partitions 1 17...
Страница 54: ...1 28 PR SM Planning Guide...
Страница 126: ...2 72 PR SM Planning Guide...
Страница 195: ...Figure 3 23 Security Page Image Profile Chapter 3 Determining the Characteristics of Logical Partitions 3 69...
Страница 220: ...4 8 PR SM Planning Guide...
Страница 232: ...5 12 PR SM Planning Guide...
Страница 250: ...B 16 PR SM Planning Guide...
Страница 266: ...D 10 PR SM Planning Guide...
Страница 272: ...X 6 PR SM Planning Guide...
Страница 273: ......
Страница 274: ...Printed in USA SB10 7041 03...