![IBM x3850 X5 Скачать руководство пользователя страница 319](http://html1.mh-extra.com/html/ibm/x3850-x5/x3850-x5_implementation-manual_4092721319.webp)
Chapter 6. IBM System x3850 X5 and x3950 X5
299
For more information and to download Electronic Service Agent, go to the following website:
https://www-304.ibm.com/support/electronic/portal/navpage.wss?category=5&locale=en
_US
6.11.4 Recovery process
This section provides an overview of several recovery procedures. These procedures do
not
replace the Problem Determination and Service Guide. You can solve many problems without
outside assistance by following the troubleshooting procedures in the Problem Determination
and Service Guide, which is available at the following website:
http://ibm.com/support/entry/portal/docdisplay?lndocid=MIGR-5084848
The Problem Determination and Service Guide describes the diagnostic tests that you can
perform, troubleshooting procedures, and explanations of error messages and error codes.
If you have completed the diagnostic procedure and the problem remains, and you have
verified that all code is at the latest level, and all hardware and software configurations are
valid, contact IBM or an approved warranty service provider for assistance.
Two-node configuration does not power on after a failure
The following list provides useful tips for bringing a 2-node configuration back online after a
failure:
Check the IMM Event Log.
Check the LEDs on the light path diagnostic panel.
Make sure that the power cord is connected to a functioning power source.
Make sure that the power cord is fully seated in the power supply.
Check the power-supply LEDs.
Check the QPI link LEDs. When the QPI link LEDs are lit, they indicate that the QPI links
are fully established.
Remove all power cords from both nodes. Wait a few seconds and replug the cords in the
following order: Top PS 2, Bottom PS 1, Top PS 1, and Bottom PS 2. You will need to have
power to all nodes at relatively the same time to ensure that the IMMs can communicate
across the QPI cables.
Remove the QPI cables to separately debug the servers. Before you remove the QPI
cables, the power
must
be removed.
One node fails in a 2-node configuration
In certain cases, resolving an issue in a 2-node configuration takes longer because it is a
difficult task. When you need the system back online as quickly as possible, you can operate
the system as a single-node configuration. Use the following steps to configure the node that
is still working:
1. Remove all power cords from the working node.
2. Remove all QPI cables from the working node.
3. If available, install the QPI wrap cards.
4. If the working node is not fully populated with memory, add the memory of the second
node. Remember the installation sequence for the memory.
Содержание x3850 X5
Страница 2: ......
Страница 3: ...International Technical Support Organization IBM eX5 Implementation Guide May 2011 SG24 7909 00...
Страница 20: ...xviii IBM eX5 Implementation Guide...
Страница 32: ...12 IBM eX5 Implementation Guide...
Страница 34: ...14 IBM eX5 Implementation Guide...
Страница 74: ...54 IBM eX5 Implementation Guide...
Страница 136: ...116 IBM eX5 Implementation Guide...
Страница 238: ...218 IBM eX5 Implementation Guide...
Страница 392: ...372 IBM eX5 Implementation Guide...
Страница 466: ...446 IBM eX5 Implementation Guide...
Страница 484: ...464 IBM eX5 Implementation Guide Figure 9 14 IMM Remote Control Video Viewer showing power control options...
Страница 560: ...540 IBM eX5 Implementation Guide...
Страница 564: ...544 IBM eX5 Implementation Guide...
Страница 578: ...IBM eX5 Implementation Guide IBM eX5 Implementation Guide...
Страница 579: ......