When the tape is properly centered, a 0.25-mm (0.01-in.) gap exists on both
sides of the pin.
11.
Close the pivot arm
▌4▐
of the leader pin attach tool by swinging it over the
leader pin so that the C-clip snaps onto the pin and the tape.
12.
Swing the pivot arm open and trim the excess tape
▌5▐
so that it is flush with
the reattached leader pin
▌6▐
.
13.
Use your fingers to remove the leader pin from the cavity
▌3▐
in the leader
pin attach tool.
14.
Use the cartridge manual rewind tool to wind the tape back into the cartridge
(wind the tape clockwise). Ensure that the leader pin is latched by the
pin-retaining spring clips on each end of the leader pin.
15.
Remove the rewind tool.
16.
Remove the leader pin attach tool by lifting its end up and away from the
cartridge.
Environmental and shipping specifications for LTO tape
cartridges
There are specific operating, storage, and shipping specifications for LTO tape
cartridges.
A67E0037
1
6
2
3
4
5
Figure 42. Attaching the leader pin to the tape
132
IBM TS4500: Introduction and Planning Guide
Содержание TS4500
Страница 1: ...IBM TS4500 Introduction and Planning Guide EC SC27 5990 06 IBM...
Страница 4: ...iv IBM TS4500 Introduction and Planning Guide...
Страница 8: ...viii IBM TS4500 Introduction and Planning Guide...
Страница 10: ...x IBM TS4500 Introduction and Planning Guide...
Страница 12: ...xii IBM TS4500 Introduction and Planning Guide...
Страница 49: ...2 and 4 Figure 9 B accessor in Service Bay B Chapter 1 Overview 31...
Страница 88: ...70 IBM TS4500 Introduction and Planning Guide...
Страница 99: ...Figure 17 Access panel for Fibre Channel and Ethernet cable routing Chapter 2 Planning 81...
Страница 186: ...Korea Notice Russia Notice 168 IBM TS4500 Introduction and Planning Guide...
Страница 217: ......
Страница 218: ...IBM Printed in USA...