![IBM TS4500 Скачать руководство пользователя страница 148](http://html1.mh-extra.com/html/ibm/ts4500/ts4500_introduction-and-planning-manual_4131234148.webp)
2.
To find the end of the tape inside the cartridge, attach the cartridge manual
rewind tool (
▌1▐
in Figure 40 on page 131) to the cartridge's hub
▌2▐
by fitting
the tool's teeth between the teeth of the hub. Turn the tool clockwise until you
see the end of the tape inside the cartridge. Then, slowly turn the rewind tool
counterclockwise to bring the tape edge toward the cartridge door
▌3▐
.
3.
Continue to turn the rewind tool counterclockwise until approximately 13 cm
(5 in.) of tape hangs from the cartridge door. If necessary, grasp the tape and
pull gently to unwind it from the cartridge.
4.
Remove the rewind tool by pulling it away from the cartridge. Set the tool
and the cartridge aside.
Figure 39. Attaching the leader pin attach tool to an LTO tape cartridge.
To hold the cartridge door open, hook the tool
into the door and pull the tool back.
130
IBM TS4500: Introduction and Planning Guide
Содержание TS4500
Страница 1: ...IBM TS4500 Introduction and Planning Guide EC SC27 5990 06 IBM...
Страница 4: ...iv IBM TS4500 Introduction and Planning Guide...
Страница 8: ...viii IBM TS4500 Introduction and Planning Guide...
Страница 10: ...x IBM TS4500 Introduction and Planning Guide...
Страница 12: ...xii IBM TS4500 Introduction and Planning Guide...
Страница 49: ...2 and 4 Figure 9 B accessor in Service Bay B Chapter 1 Overview 31...
Страница 88: ...70 IBM TS4500 Introduction and Planning Guide...
Страница 99: ...Figure 17 Access panel for Fibre Channel and Ethernet cable routing Chapter 2 Planning 81...
Страница 186: ...Korea Notice Russia Notice 168 IBM TS4500 Introduction and Planning Guide...
Страница 217: ......
Страница 218: ...IBM Printed in USA...