Removing
the
components
This
section
provides
procedures
for
removing
components
from
the
DS4800
before
lifting
it
from
the
shipping
box
and
placing
the
DS4800
in
the
cabinet.
Removing
components
from
a
DS4800
Storage
Subsystem
makes
the
storage
subsystem
lighter
and
easier
to
lift
from
the
shipping
box
and
install
in
the
rack
cabinet.
Place
the
components
on
a
dry,
level,
and
static-free
surface
to
protect
them
from
electrostatic
discharge
after
you
remove
them
from
the
DS4800.
Use
these
instructions
after
you
have
completed
all
applicable
site,
rack
cabinet,
and
DS4800
preparations
(as
discussed
in
and
installed
the
support
rails
(as
discussed
in
You
will
need
an
antistatic
wrist
strap
and
a
cart
or
level
surface
(to
hold
the
components).
Observe
the
precautions
listed
in
In
the
following
procedure,
you
will
remove
the
following
components
from
the
storage
subsystem
before
you
install
it
in
the
rack
cabinet:
v
RAID
controllers
v
Power
supply-fan
units
v
Interconnect-battery
unit
Statement
4:
≥
18
kg
(39.7
lb)
≥
32
kg
(70.5
lb)
≥
55
kg
(121.2
lb)
CAUTION:
Use
safe
practices
when
lifting.
Attention:
A
fully-populated
DS4800
Storage
Subsystem
weighs
36.52
kg
(80.7
lb).
Do
not
attempt
to
lift
the
DS4800
Storage
Subsystem
from
the
shipping
box
or
install
the
unit
in
the
rack
cabinet
unless
all
of
the
components
have
been
removed.
If
you
choose
to
lift
the
DS4800
Storage
Subsystem
from
the
shipping
box
or
install
the
unit
in
the
rack
without
removing
all
of
the
components
first,
you
do
so
at
your
own
risk.
For
more
information
on
the
weights
of
the
individual
DS4800
Storage
Subsystem
components,
see
Electrostatic
discharge
can
damage
sensitive
components.
Touching
the
DS4800
Storage
Subsystem
or
its
components
without
using
a
proper
ground
might
damage
the
equipment.
To
avoid
damage,
use
proper
antistatic
protection
before
handling
any
components.
1.
Open
the
two
long
sides
of
the
shipping
box,
if
you
have
not
done
so
already.
Opening
the
long
sides
of
the
box
to
a
horizontal
position
provides
access
to
the
storage
subsystem
components.
Chapter
2.
Installing
the
storage
subsystem
39
Содержание TotalStorage DS4800
Страница 1: ...IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide GC26 7845 00...
Страница 2: ......
Страница 3: ...IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide GC26 7845 00...
Страница 18: ...xvi IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 22: ...xx IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 55: ...ds48020 Figure 12 DS4800 front rack mounting template Chapter 2 Installing the storage subsystem 33...
Страница 68: ...46 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 114: ...92 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 154: ...132 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 200: ...178 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 202: ...180 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 205: ...ds48021 Figure 102 DS4800 rear rack mounting template Appendix C Rack mounting templates 183...
Страница 206: ...184 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 226: ...204 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 233: ......
Страница 234: ...Part Number 23R1992 Printed in USA GC26 7845 00 1P P N 23R1992...