IBM TotalStorage DS4800 Скачать руководство пользователя страница 1

IBM

 

System

 

Storage

 

DS4800

 

Storage

 

Subsystem

 

Installation

 

and

 

Cabling

 

Overview

 

򔻐򗗠򙳰

Table

 

1

 

summarizes

 

the

 

steps

 

required

 

to

 

correctly

 

install,

 

cable,

 

and

 

power

 

on

 

your

 

IBM

®

 

System

 

Storage

®

 

DS4800

 

storage

 

subsystem.

 

Unless

 

otherwise

 

stated,

 

all

 

the

 

following

 

tasks

 

are

 

detailed

 

on

 

the

 

pages

 

numbers

 

referenced

 

in

 

the

 

IBM

 

System

 

Storage

 

DS4800

 

Storage

 

Subsystem

 

Installation,

 

User’s,

 

and

 

Maintenance

 

Guide

.

 

Review

 

the

 

multilingual

 

IBM

 

Safety

 

Information

 

document

 

and

 

read

 

all

 

safety

 

information

 

in

 

the

 

IBM

 

System

 

Storage

 

DS4800

 

Storage

 

Subsystem

 

Installation,

 

User’s,

 

and

 

Maintenance

 

Guide

 

before

 

you

 

begin

 

the

 

installation.

 

 

Attention:

  

Before

 

powering

 

on

 

the

 

DS4800,

 

the

 

storage

 

subsystem

 

must

 

be

 

cabled

 

to

 

at

 

least

 

one

 

storage

 

expansion

 

enclosure

 

populated

 

with

 

at

 

least

 

two

 

drives.

 

If

 

at

 

least

 

two

 

drives

 

are

 

not

 

installed

 

in

 

each

 

attached

 

enclosure

 

when

 

you

 

power

 

on

 

the

 

DS4800,

 

your

 

standard

 

storage

 

partition

 

key

 

will

 

be

 

lost

 

and

 

must

 

be

 

regenerated.

 

In

 

addition,

 

the

 

resulting

 

insufficient

 

load

 

to

 

the

 

enclosure

 

power

 

supplies

 

might

 

cause

 

them

 

to

 

intermittently

 

appear

 

as

 

failed,

 

falsely

 

indicating

 

the

 

power

 

supplies

 

are

 

bad.

 

All

 

drives

 

in

 

the

 

connected

 

enclosure

 

or

 

enclosures

 

must

 

contain

 

no

 

prior

 

configuration

 

data.

 

 

Table

 

1.

 

Installation

 

tasks

 

Task

 

Detailed

 

Description

 

1

 

Review

 

the

 

DS4800

 

installation

 

recommendations

 

and

 

requirements.

 

“Preparing

 

for

 

installation”

 

on

 

page

 

29

 

2

 

Fold

 

down

 

and

 

open

 

the

 

sides

 

of

 

the

 

shipping

 

box.

 

Without

 

removing

 

the

 

DS4800

 

from

 

the

 

box,

 

you

 

can

 

remove

 

the

 

DS4800

 

rack

 

mounting

 

rails

 

and

 

hardware

 

from

 

the

 

box.

 

Install

 

the

 

support

 

rails

 

in

 

the

 

rack

 

cabinet.

 

“Installing

 

the

 

support

 

rails”

 

on

 

page

 

32

 

3

 

Before

 

removing

 

the

 

DS4800

 

from

 

the

 

shipping

 

box,

 

remove

 

the

 

components

 

to

 

lighten

 

the

 

unit.

 

“Removing

 

the

 

components”

 

on

 

page

 

39

 

4

 

Record

 

the

 

serial

 

number,

 

machine

 

type,

 

model

 

number,

 

and

 

RAID

 

controller

 

MAC

 

addresses

 

for

 

your

 

DS4800.

 

Appendix

 

B,

 

“Records,”

 

on

 

page

 

177

 

5

 

Install

 

and

 

secure

 

the

 

DS4800

 

chassis

 

in

 

the

 

rack

 

cabinet.

 

“Installing

 

the

 

DS4800

 

on

 

the

 

support

 

rails”

 

on

 

page

 

41

 

6

 

Replace

 

the

 

components

 

in

 

the

 

installed

 

DS4800

 

chassis.

 

“Replacing

 

the

 

components”

 

on

 

page

 

43

 

7

 

Install

 

in

 

the

 

rack

 

cabinet

 

the

 

DS4000

 

storage

 

expansion

 

enclosures

 

you

 

will

 

cable

 

to

 

the

 

DS4800.

 

Installation,

 

User’s,

 

and

 

Maintenance

 

Guide

 

for

 

your

 

DS4000

 

storage

 

expansion

 

enclosure.

 

8

 

Use

 

SFP

 

modules

 

and

 

FC

 

cables

 

to

 

cable

 

the

 

DS4800

 

to

 

at

 

least

 

one

 

DS4000

 

storage

 

expansion

 

enclosure.

 

“Connecting

 

storage

 

expansion

 

enclosures”

 

on

 

page

 

59

 

9

 

After

 

you

 

cable

 

the

 

DS4000

 

storage

 

expansion

 

enclosures,

 

you

 

must

 

set

 

the

 

enclosure

 

IDs

 

for

 

all

 

enclosures

 

in

 

the

 

configuration.

 

“Storage

 

expansion

 

enclosure

 

settings”

 

on

 

page

 

77

 

10

 

For

 

out-of-band

 

management:

 

Cable

 

the

 

DS4800

 

Ethernet

 

ports

 

to

 

either

 

the

 

management

 

workstation

 

or

 

to

 

the

 

hosts.

 

“Connecting

 

secondary

 

interface

 

cables”

 

on

 

page

 

81

 

For

 

in-band

 

management:

 

Cable

 

the

 

DS4800

 

host

 

channels

 

to

 

the

 

FC

 

HBAs

 

in

 

either

 

the

 

hosts

 

or

 

the

 

FC

 

switch

 

that

 

connects

 

to

 

the

 

host

 

FC

 

HBAs.

 

“Connecting

 

hosts

 

to

 

the

 

DS4800”

 

on

 

page

 

79

 

11

 

Connect

 

the

 

power

 

cables

 

for

 

the

 

DS4800.

 

“Connecting

 

the

 

power

 

cables”

 

on

 

page

 

87

 

 

Содержание TotalStorage DS4800

Страница 1: ...thout removing the DS4800 from the box you can remove the DS4800 rack mounting rails and hardware from the box Install the support rails in the rack cabinet Installing the support rails on page 32 3 B...

Страница 2: ...asks required after you install the DS4800 in a rack cabinet Review the following sections and then follow the instructions provided in the IBM System Storage DS4800 Storage Subsystem Installation Use...

Страница 3: ...s well supported To install an SFP module and fibre channel cable 1 Remove the protective caps from the SFP module and from the fibre channel cable Do not touch the exposed fibre optic cable 2 Insert...

Страница 4: ...te information on enclosure support and intermixing requirements for the DS4800 storage subsystem Redundant host side fibre channel cabling The DS4800 supports redundant connections to up to four host...

Страница 5: ...overnment Users Documentation related to restricted rights Use duplication or disclosure is subject to restrictions set forth in GSA ASP Schedule Contract with IBM Corp Host 1 Host Adapter 1 and 2 Hos...

Страница 6: ...This page intentionally left blank 6...

Страница 7: ...This page intentionally left blank 7...

Страница 8: ...ition May 2006 Copyright International Business Machines Corporation 2006 All rights reserved US Government Users Restricted Rights Use duplication or disclosure restricted by GSA ADP Schedule Contrac...

Отзывы: