Appendix B. Blank planning worksheets
This appendix contains the following blank worksheets that you can use when you
plan the installation of a 3534 Model F08 in an operational environment:
v
Planning worksheet
v
Port configuration worksheet
v
Zone definition worksheet
v
Zone configuration worksheet
Make as many copies of the blank worksheets as you need to plan the installation
of your switches. Give your system administrator copies of the completed
worksheets.
For information about planning your installation, including examples of how to use
these worksheets, see Chapter 2, “Planning the installation” on page 5.
© Copyright IBM Corp. 2002
33
Содержание TotalStorage 3534-F08
Страница 2: ......
Страница 3: ...IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide SY27 7631 00...
Страница 8: ...vi IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Страница 10: ...viii IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Страница 16: ...xiv IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Страница 42: ...24 IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Страница 56: ...38 IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Страница 62: ...44 IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...
Страница 79: ......
Страница 81: ...Spine information IBM TotalStorage SAN Fibre Channel Switch 3534 Model F08 Installation Guide...