Rack Mounting Instructions
• Review the documentation that comes with your rack enclosure.
• Maintain 15 cm (6 in.) of clearance around your appliance for air circulation.
• Ensure the room air temperature is below 35°C (95°F).
• Plan the
installation working from the bottom of the rack up.
• Remove the rack doors and the side panels during the installation, if necessary.
• Position the template to the rack so that the edges of the template do not
overlap any other devices to be installed.
• Connect all power cords on the
and on other devices to properly wired
and grounded electrical outlets.
• Take precautions to prevent the rack from overloading the power outlets
when you install multiple devices in a rack.
appliance
appliance
The following is a list of items shipped in your rack installation kit. If any
items are missing or damaged, contact your place of purchase.
• Do not place any object weighing more than 82 kg
(180 lb) on top of rack-mounted devices.
• Use safe practices when lifting.
32 kg (70.5 lb)
82 kg (180 lb)
• Cable-management assembly
• Cable straps (7)
• Cable ties (10)
• Cage nuts (12)
• Clip nuts (12)
• Screw packages (2)
• Slide rails (2)
Use a screwdriver or the cage-nut-insertion
tool to insert the cage nuts, or s
as required for your rack, into all the
marked holes.
lide on the clip
nuts,
Use the attached stickers to mark the holes on
the front and the rear of the rack in the
locations indicated by the arrows on the
template.
Cage
nuts
Cage
nuts
Clip
nuts
2
T
e
m
p
l
a
t
e
1
Figure 2. Rack mounting instructions
8
IBM TotalStorage
™
Network Attached Storage 200 Installation Guide
Содержание totalstorage 200
Страница 1: ...IBM TotalStorage Network Attached Storage 200 Models 200 and 225 Hardware Installation Guide ...
Страница 2: ......
Страница 3: ...IBM TotalStorage Network Attached Storage 200 Models 200 and 225 Hardware Installation Guide ...
Страница 8: ...vi IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 10: ...viii IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 14: ...xii IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 18: ...4 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 40: ...26 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 86: ...72 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 99: ...Appendix B Safety and environmental notices 85 ...
Страница 100: ...86 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 101: ...Appendix B Safety and environmental notices 87 ...
Страница 102: ...88 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 103: ...Appendix B Safety and environmental notices 89 ...
Страница 104: ...90 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 117: ...Appendix B Safety and environmental notices 103 ...
Страница 130: ...116 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 144: ...130 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 147: ...warranty statement 119 Index 133 ...
Страница 148: ...134 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 151: ......