3.
Working at the front of the rack cabinet, identify the two standard rack units
(2U) of space in the rack into which you want to install the support rails.
Figure 9 on page 13 shows two rack units with the front mounting holes
identified.
fab10050
Figure 8. Installing the rail spring
12
Storwize V7000 Gen2: Quick Installation Guide