MAP 0530: Switch Assembly Power
027 (continued)
– Put circuit breaker at front of switch assembly in the On (‘1’) position.
– Check Power (green) LED for an OFF condition.
Is the Power (green) LED OFF?
Yes No
028
– Go to Step 033.
029
Problem not resolved.
Did you just replace the switch assembly or switch power card?
Yes No
030
– Put switch assembly into the service position again. (Refer to "Removing a Switch Assembly into
the Service Position" in
IBM RS/6000 SP: Maintenance Information, Volume 3, Locations and
Service Procedures.)
– Replace the switch supervisor card.
– Replace the switch from service position (refer to "Service Position Procedures" in
IBM RS/6000
SP: Maintenance Information, Volume 3, Locations and Service Procedures), connecting only
cables at S00-BH-J1 and S00-BH-J2.
– Put circuit breaker at front of switch assembly in the On (‘1’) position.
– Check Power (green) LED for an OFF condition.
Is the Power (green) LED OFF?
Yes No
031
– Go to Step 033.
032
– Put switch assembly into the service position again. (Refer to "Removing a Switch Assembly into
the Service Position" in
IBM RS/6000 SP: Maintenance Information, Volume 3, Locations and
Service Procedures.)
– Replace the switch supervisor control cable. Refer to Figure 1-33 on page 1-305.
– Replace the switch from service position (refer to "Service Position Procedures" in
IBM RS/6000
SP: Maintenance Information, Volume 3, Locations and Service Procedures), connecting only
cables at S00-BH-J1 and S00-BH-J2.
– Put circuit breaker at front of switch assembly in the On (‘1’) position.
– Check Power (green) LED for an OFF condition.
Is the Power (green) LED OFF?
Yes No
033
Problem resolved.
– Reconnect all cables at bulkhead of switch assembly.
– Go to Step 101 on page 1-350.
034
(Step 034 continues)
Chapter 1. Maintenance Analysis Procedures (MAPs)
1-317
Содержание RS/6000 SP
Страница 1: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Страница 2: ......
Страница 3: ...RS 6000 SP IBM Maintenance Information Volume 2 Maintenance Analysis Procedures GA22 7376 01...
Страница 8: ...vi RS 6000 SP MAPs...
Страница 10: ...viii RS 6000 SP MAPs...
Страница 16: ...xiv RS 6000 SP MAPs...
Страница 20: ...xviii RS 6000 SP MAPs...
Страница 60: ...MAP 0130 Processor Node Figure 1 7 Thin Node High Level Diagram 1 40 RS 6000 SP MAPs...
Страница 64: ...MAP 0130 Processor Node Figure 1 11 604 or 604e High Node High Level Component Diagram 1 44 RS 6000 SP MAPs...
Страница 196: ...MAP 0300 332 MHz SMP Node Power 064 continued Go to Step 008 on page 1 169 1 176 RS 6000 SP MAPs...
Страница 383: ......
Страница 387: ......