ServeRAID-MR10i User’s Guide
6-1
Chapter 6
Using the Intelligent
Battery Backup Unit
This chapter explains how to monitor and maintain the intelligent Battery
Backup Unit (iBBU) for your ServeRAID-MR10i SAS/SATA Controller.
Most of the iBBU functions, such as battery recharging, occur
automatically. Click on the following links to view instructions on how to
use the iBBU:
•
Section 6.1, “Monitoring the iBBU with the MegaRAID Configuration
Utilities”
•
Section 6.2, “Replacing the Battery Backup Unit”
•
Section 6.3, “Transferring Cached Data from a Failed Controller”
•
Section 6.4, “Resolving a Configuration Mismatch”
You can monitor the battery status (temperature, voltage, and so on) in
these MegaRAID
®
utility programs:
•
WebBIOS Configuration Utility
•
MegaCLI (Command Line Interface)
•
MegaRAID Storage Manager (MSM)
The MegaRAID utilities display a counter showing the number of times
the battery pack on the iBBU has been recharged. When you install a
new iBBU, the battery recharge cycle counter for the iBBU is
automatically set to zero.
Note:
For optimal performance, replace the iBBU once a year.
This chapter describes only the iBBU-related features of the MegaRAID
utility programs. For complete information on these utilities, see the
ServeRAID-MR Software User’s Guide
, IBM Document Number
46M1381.
Содержание Redbooks ServeRAID-MR10i
Страница 1: ...ServeRAID MR10i USER S GUIDE F e b r u a r y 2 0 0 9 IBM P N 46M1377...
Страница 12: ...xii Contents...
Страница 14: ...xiv Contents...
Страница 16: ...xvi Contents...
Страница 58: ...5 6 Installing the Intelligent Battery Backup Unit...
Страница 78: ...A 4 Notices...
Страница 84: ...B 6 Glossary of Terms and Abbreviations...
Страница 85: ......
Страница 86: ...4 6 M1 3 7 7...