Figure 41. Locking the front door
Preparing the system for operation after removing and replacing an internal RDX docking station in
the 9009-41A, 9009-42A, or 9223-42H
To prepare the system for operation after removing and replacing an internal RDX docking station,
complete the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover.
For a rack-mounted system, complete the following steps. Refer to Figure 42 on page 49.
a. Slide the cover (A) onto the system unit.
b. Close the release latch (B) by pushing it in the direction shown.
48 Power Systems: RDX docking stations, power cable, and removable disk drives for the 9009-41A, 9009-42A,
or 9223-42H
Содержание RDX
Страница 4: ...iv...
Страница 71: ...or or or RDX docking stations removable disk drives and power cable for the 9009 41A 9009 42A or 9223 42H 57...
Страница 111: ......
Страница 112: ...IBM...