CAUTION: Pinch hazard. (L012)
9. Remove the service access cover. For instructions, see “Removing the service access cover from a
Preparing the 9183-22X system for operation after you remove and replace internal parts
To prepare the system for operation after you remove and replace internal parts, complete the steps in
this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover. For instructions, see “Installing the service access cover on a
3. Place the system into the operating position. For instructions, see “Placing a 9183-22X system into
the operating position” on page 110.
(L012)
CAUTION: Pinch hazard. (L012)
4. Tighten the cover screw (C) at the rear of the system as shown in the following figure.
Installing and configuring the 9183-22X 101
Содержание Power System IC922
Страница 1: ...Power Systems Installing the System and Ordered Parts for the IBM Power System IC922 9183 22X IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems Installing the System and Ordered Parts for the IBM Power System IC922 9183 22X...
Страница 57: ...Figure 35 PCIe3 LP 2 port 25 10 Gb NIC RoCE SFP28 Adapter FC EC2T Installing and configuring the 9183 22X 43...
Страница 77: ...Figure 45 FC EK4L low profile NVIDIA T4 PCIe GPU accelerator adapter Installing and configuring the 9183 22X 63...
Страница 81: ...Figure 47 PCIe3 16 Gb 2 port Fibre Channel adapter FC EL43 and EN0B Installing and configuring the 9183 22X 67...
Страница 112: ...or or or 98 Power Systems Installing the System and Ordered Parts for the IBM Power System IC922 9183 22X...
Страница 130: ...or or or 116 Power Systems Installing the System and Ordered Parts for the IBM Power System IC922 9183 22X...
Страница 134: ...120 Power Systems Installing the System and Ordered Parts for the IBM Power System IC922 9183 22X...
Страница 145: ......
Страница 146: ...IBM...