Figure 119. Replacing the air baffle
What to do next
Prepare the system for operation. For instructions, see “Preparing the 9183-22X system for operation
after you remove and replace internal parts” on page 150.
Removing and replacing the trusted platform module card in the 9183-22X
system
Find information about removing and replacing the trusted platform module (TPM) card in the IBM Power
System IC922 (9183-22X) server.
Removing the trusted platform module card from the 9183-22X system
To remove a trusted platform module (TPM) card, complete the steps in this procedure.
Before you begin
Power off the system and place it in the service position. For instructions, see “Preparing the 9183-22X
system to remove and replace internal parts” on page 146.
132 Power Systems: Servicing the IBM Power System IC922 (9183-22X)
Содержание Power System IC922
Страница 1: ...Power Systems Servicing the IBM Power System IC922 9183 22X IBM...
Страница 14: ...xiv Power Systems Servicing the IBM Power System IC922 9183 22X...
Страница 178: ...164 Power Systems Servicing the IBM Power System IC922 9183 22X...
Страница 189: ......
Страница 190: ...IBM...