background image

v

Install the VIOS operating system. For instructions, see Installing VIOS (http://www.ibm.com/
support/knowledgecenter/POWER8/p8hch/p8hch_installvios.htm).

5.

If required, update the system firmware.

v

For instructions to get firmware fixes through the AIX or Linux operating system, see Getting
server firmware fixes through AIX or Linux without a management console 
(http://www.ibm.com/
support/knowledgecenter/POWER8/p8ha5/fix_firm_no_hmc_aix.htm).

v

If you are using VIOS, see Updating the Virtual I/O Server's firmware and device microcode with
an Internet connection 
(http://www.ibm.com/support/knowledgecenter/POWER8/p8ha5/
fix_virtual_firm_ivm.htm).

6.

You have now completed the steps to install your server.

Installing a rack-based water-cooled server

Use this information to learn about installing a rack-based water-cooled server.

Prerequisites for installing the water-cooled system

Use the information to understand the prerequisites that are required for installing the server.

You might need to read the following documents before you install the server:

v

The latest version of this document is maintained online, see (http://www.ibm.com/support/
knowledgecenter/POWER8/p8egi/p8egi_roadmap.htm).

v

To plan your server installation, see Planning for the system (http://www.ibm.com/support/
knowledgecenter/POWER8/p8had/p8had_8xx_kickoff.htm).

v

To plan for water-cooling, see Model 8247-22L and 8284-22A water cooling option (Feature code
ER2C)

(http://www.ibm.com/support/knowledgecenter/POWER8/p8had/p8had_watercool.htm).

v

If you are using a Hardware Management Console (HMC), see Obtaining and applying machine code
updates for the HMC with an Internet connection 
(http://www.ibm.com/support/knowledgecenter/
POWER8/p8hai/area3fixeshmc.htm).

Consider the following prerequisites before you install the server:

1.

Ensure that you have the following items before you start your installation:

v

Phillips screwdriver

v

Flat-head screwdriver

v

Rack with two units of space

Note:

If you do not have a rack that is installed, install the rack. For instructions, see Racks and rack

features (http://www.ibm.com/support/knowledgecenter/POWER8/p8hbf/p8hbf_8xx_kickoff.htm).

2.

Ensure that you have one of the following consoles:

v

Hardware Management Console (HMC): Ensure that your HMC is at version 8 release 8.4.0 or later.

v

Graphic monitor with keyboard and mouse.

v

Teletype (tty) monitor with keyboard.

Completing inventory for your server

Use this information to complete inventory for your server.

To complete the inventory, complete the following steps:

1.

Verify that you received all the boxes you ordered.

2.

Unpack the server components as needed.

3.

Complete a parts inventory before you install each server component by following these steps:

a.

Locate the inventory list for your server.

b.

Ensure that you received all the parts that you ordered.

18

Power Systems: Installing the IBM Power System S822L (8247-22L)

Содержание Power System 8247-22L

Страница 1: ...Power Systems Installing the IBM Power System S822L 8247 22L GI11 9908 06 IBM ...

Страница 2: ......

Страница 3: ...Power Systems Installing the IBM Power System S822L 8247 22L GI11 9908 06 IBM ...

Страница 4: ... Notices manual G229 9054 and the IBM Environmental Notices and User Guide Z125 5823 This edition applies to IBM Power Systems servers that contain the POWER8 processor and to all associated models Copyright IBM Corporation 2014 2017 US Government Users Restricted Rights Use duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp ...

Страница 5: ...247 21L system into the rack 27 Connecting the supply and return hoses to the manifold 29 Routing the hoses from the system to the manifold 30 Turning on the water source and bleeding air from the system 30 Cabling the server and setting up a console 31 Determining which console to use 31 Cabling the server with an ASCII terminal 31 Cabling the server to the HMC 33 Cabling the server and accessing...

Страница 6: ...for IBM Power Systems servers 48 Privacy policy considerations 49 Trademarks 50 Electronic emission notices 50 Class A Notices 50 Class B Notices 54 Terms and conditions 57 iv Power Systems Installing the IBM Power System S822L 8247 22L ...

Страница 7: ...itional copies of safety information documentation can be obtained by calling the IBM Hotline at 1 800 300 8751 German safety information Das Produkt ist nicht für den Einsatz an Bildschirmarbeitsplätzen im Sinne 2 der Bildschirmarbeitsverordnung geeignet Laser safety information IBM servers can use I O cards or features that are fiber optic based and that utilize lasers or LEDs Laser compliance I...

Страница 8: ...nect 1 Turn off everything unless instructed otherwise 2 For AC power remove the power cords from the outlets 3 For racks with a DC power distribution panel PDP turn off the circuit breakers located in the PDP and remove the power from the Customer s DC power source 4 Remove the signal cables from the connectors 5 Remove all cables from the devices To Connect 1 Turn off everything unless instructe...

Страница 9: ...emperatures will exceed the manufacturer s recommended ambient temperature for all your rack mounted devices v Do not install a unit in a rack where the air flow is compromised Ensure that air flow is not blocked or reduced on any side front or back of a unit used for air flow through the unit v Consideration should be given to the connection of the equipment to the supply circuit so that overload...

Страница 10: ...e potential hazards v Verify that the route that you choose can support the weight of the loaded rack cabinet Refer to the documentation that comes with your rack cabinet for the weight of a loaded rack cabinet v Verify that all door openings are at least 760 x 230 mm 30 x 80 in v Ensure that all devices shelves drawers doors and cables are secure v Ensure that the four leveling pads are raised to...

Страница 11: ...DANGER Rack mounted devices are not to be used as shelves or work spaces L002 L003 1 2 or 1 2 or 1 2 3 4 or Safety notices ix ...

Страница 12: ... be equipped with multiple AC power cords or multiple DC power cables To remove all hazardous voltages disconnect all power cords and power cables L003 L007 CAUTION A hot surface nearby L007 L008 x Power Systems Installing the IBM Power System S822L 8247 22L ...

Страница 13: ...ptacle Although shining light into one end and looking into the other end of a disconnected optical fiber to verify the continuity of optic fibers many not injure the eye this procedure is potentially dangerous Therefore verifying the continuity of optical fibers by shining light into one end and looking at the other end is not recommended To verify continuity of a fiber optic cable use an optical...

Страница 14: ...rhanging load v Do not use on uneven surface incline or decline major ramps v Do not stack loads v Do not operate while under the influence of drugs or alcohol v Do not support ladder against LIFT TOOL v Tipping hazard Do not push or lean against load with raised platform v Do not use as a personnel lifting platform or step No riders v Do not stand on any part of lift Not a step v Do not climb on ...

Страница 15: ...ding interfaces only Type 2 or Type 4 ports as described in GR 1089 CORE and require isolation from the exposed OSP cabling The addition of primary protectors is not sufficient protection to connect these interfaces metallically to OSP wiring Note All Ethernet cables must be shielded and grounded at both ends The ac powered system does not require the use of an external surge protection device SPD...

Страница 16: ...xiv Power Systems Installing the IBM Power System S822L 8247 22L ...

Страница 17: ...he prerequisites that are required for installing the server Attention v Attach an electrostatic discharge ESD wrist strap to the front ESD jack to the rear ESD jack or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging your hardware v When you use an ESD wrist strap follow all electrical safety procedures An ESD wrist strap is used for static contr...

Страница 18: ...If you have incorrect missing or damaged parts consult any of the following resources v Your IBM reseller v IBM Rochester manufacturing automated information line at 1 800 300 8751 United States only v The Directory of worldwide contacts website http www ibm com planetwide Select your location to view the service and support contact information Determining and marking the location in the rack You ...

Страница 19: ...wer hole of each EIA unit 6 Repeat step 5 for the corresponding holes located on the left side of the rack 7 Go to the rear of the rack 8 On the right side find the EIA unit that corresponds to the bottom EIA unit marked on the front of the rack 9 Place a self adhesive dot at the bottom EIA unit 10 Mark the corresponding holes on the left side of the rack Figure 1 Removing the filler panels Instal...

Страница 20: ...mplete the following steps 1 Each slide rail is marked with either an R right or an L left when you look from the front Select the left slide rail bring it to the rear of the rack and locate the selected EIA unit that was previously marked 2 Push up on the locking tab 1 on the front and pull out the front latch 2 at the front of the rail Then remove the screw from the rear of the rail 3 For detail...

Страница 21: ... and insert three pins on the front of the rail into the holes within the selected EIA unit that were previously marked Lower the slide rail down 1 to engage the hook feature on the middle pin For details see Figure 5 Figure 3 Aligning and engaging the pins into the holes in the rear of the rack Figure 4 Reinstalling the screw Figure 5 Pins that are seated on the front rail of the rack Installing ...

Страница 22: ...SD wrist strap is used for static control It does not increase or decrease your risk of receiving electric shock when using or working on electrical equipment v If you do not have an ESD wrist strap just prior to removing the product from ESD packaging and installing or replacing hardware touch an unpainted metal surface of the system for a minimum of 5 seconds To install the system into the rack ...

Страница 23: ...nstall the cable management arm To install the cable management arm complete the following steps 1 Ensure that you have the following parts Item Description A Support arm B Cable management stop bracket C Mounting bracket D Cable management arm E Extension bracket 1 2 3 4 5 P8EG1502 0 Figure 7 Extending slide rails and aligning server nail heads with the slots on the rail 2 P8EG1501 0 1 Figure 8 L...

Страница 24: ...d DOWN Ensure that the side labeled UP is facing upward and to the right 3 Locate the hole at the bottom inside corner of the L shaped cable management stop bracket B Position the unattached end of the support arm so that the locking tab on the underside of its tip aligns with the bracket hole Insert the tab into the hole 1 and turn the bracket 2 to secure it to the support arm For details see Fig...

Страница 25: ... into place For details see Figure 12 5 Slide the extension bracket E into the right slide rail until the spring loaded pin snaps into place For details see Figure 13 on page 10 Figure 11 Securing the cable management stop bracket to the support arm Figure 12 Extending the pin and installing the bracket into the slide rail Installing the IBM Power System S822L 8247 22L 9 ...

Страница 26: ...he slot on the mounting bracket C Push the tab until the spring loaded latch snaps into place Slide the other cable management arm tab into the extension bracket E on the outside of the right slide rail 2 Push the tab until the spring loaded latch snaps into place For details see Figure 15 on page 11 and Figure 16 on page 11 Figure 13 Installing the extension bracket into the slide rail Figure 14 ...

Страница 27: ...ou install in your primary partition and whether you install a Virtual I O Server VIOS in one of your logical partitions P7EF3502 2 1 D A C Figure 15 Sliding the cable management arm tab into the mounting bracket slot P7EF3503 1 2 E D Figure 16 Sliding the other cable management arm tab into the extension bracket Installing the IBM Power System S822L 8247 22L 11 ...

Страница 28: ... modem Cabling the server with an ASCII terminal Hardware Management Console HMC AIX Linux or VIOS Yes Ethernet or cross over cable Cabling the server to the HMC on page 13 Integrated Virtualization Manager for VIOS AIX or Linux Yes Serial cable Cabling the server and accessing the IVM on page 15 Keyboard video and mouse Linux or VIOS Yes Monitor and USB cables equipped with keyboard video and mou...

Страница 29: ...default settings for the diagnostic programs Be sure that your terminal is set according to these attributes before proceeding to the next step Table 3 Default settings for the diagnostic programs General setup attributes 3151 11 31 41 settings 3151 51 61 settings 3161 64 settings Description Line speed 19 200 19 200 19 200 Uses the 19 200 bits per second line speed to communicate with the system ...

Страница 30: ...o learn how to connect an HMC to a private network so that it can manage more than one managed system see HMC network connections http www ibm com support knowledgecenter POWER8 p8hai netconhmc htm Notes v You can also have multiple systems that are attached to a switch that is then connected to the HMC For instructions see HMC network connections http www ibm com support knowledgecenter POWER8 p8...

Страница 31: ...ted Virtualization Manager on an IBM System i model select AIX or Linux in the Default partition environment field 5 Click Save settings and power on d Open a terminal session on the PC using an application such as HyperTerminal and wait for the SMS menu to appear Be sure that the line speed is set to 19 200 bits per second to communicate with the system unit e Using the Web based ASMI change the ...

Страница 32: ...s to the PDU with an IEC 320 type receptacle 2 Attach the PDU input power cord and plug it into the power source 3 If your system uses two PDUs for redundancy complete the following steps v If your system has two power supplies attach one power supply to each of the two PDUs v If your system has four power supplies plug E1 and E2 to PDU A and E3 and E4 to PDU B Note Confirm that the system is in s...

Страница 33: ...ay complete the following steps a Access the Advanced System Management Interface ASMI For instructions see Accessing the ASMI without an HMC http www ibm com support knowledgecenter POWER8 p8hby connect_asmi htm b On the ASMI Welcome pane note the existing level of server firmware in the upper right corner under the copyright statement c Update the time of day In the navigation area expand System...

Страница 34: ...plan for water cooling see Model 8247 22L and 8284 22A water cooling option Feature code ER2C http www ibm com support knowledgecenter POWER8 p8had p8had_watercool htm v If you are using a Hardware Management Console HMC see Obtaining and applying machine code updates for the HMC with an Internet connection http www ibm com support knowledgecenter POWER8 p8hai area3fixeshmc htm Consider the follow...

Страница 35: ...ion v Organize larger and heavier units into the lower part of the rack v Plan to install units into the lower part of the rack first v Record the Electronic Industries Alliance EIA locations in your plan Note The server is two EIA units high An EIA unit is 44 55 mm 1 75 in in height The rack contains three mounting holes for each EIA unit of height This system unit therefore is 89 mm 3 5 in high ...

Страница 36: ...of each EIA unit 8 Repeat step 7 for the corresponding holes located on the left side of the rack 9 Go to the rear of the rack 10 On the right side find the EIA unit that corresponds to the bottom EIA unit marked on the front of the rack 11 Place a self adhesive dot at the bottom EIA unit 12 Mark the corresponding holes on the left side of the rack Figure 18 Removing the filler panels 20 Power Sys...

Страница 37: ...ck complete the following steps 1 Each slide rail is marked with either an R right or an L left when you look from the front Select the left slide rail bring it to the rear of the rack and locate the selected EIA unit that was previously marked 2 Push up on the locking tab 1 on the front and pull out the front latch 2 at the front of the rail Then remove the screw from the rear of the rail 3 For d...

Страница 38: ...ert three pins on the front of the rail into the holes within the selected EIA unit that were previously marked Lower the slide rail down 1 to engage the hook feature on the middle pin For details see Figure 22 Figure 20 Aligning and engaging the pins into the holes in the rear of the rack Figure 21 Reinstalling the screw Figure 22 Pins that are seated on the front rail of the rack 22 Power System...

Страница 39: ... the right rail into the rack Installing the cable management arm The cable management arm is used to efficiently route cables so that you have proper access to the rear of the system Use the procedure to install the cable management arm To install the cable management arm complete the following steps 1 Ensure that you have the following parts Item Description A Support arm B Cable management stop...

Страница 40: ... DOWN Ensure that the side labeled UP is facing upward and to the right 3 Locate the hole at the bottom inside corner of the L shaped cable management stop bracket B Position the unattached end of the support arm so that the locking tab on the underside of its tip aligns with the bracket hole Insert the tab into the hole 1 and turn the bracket 2 to secure it to the support arm For details see Figu...

Страница 41: ... place For details see Figure 12 on page 9 5 Slide the extension bracket E into the right slide rail until the spring loaded pin snaps into place For details see Figure 13 on page 10 Figure 26 Securing the cable management stop bracket to the support arm Figure 27 Extending the pin and installing the bracket into the slide rail Installing the IBM Power System S822L 8247 22L 25 ...

Страница 42: ...nto the slot on the mounting bracket C Push the tab until the spring loaded latch snaps into place Slide the other cable management arm tab into the extension bracket E on the outside of the right slide rail 2 Push the tab until the spring loaded latch snaps into place For details see Figure 15 on page 11 and Figure 16 on page 11 Figure 28 Installing the extension bracket into the slide rail Figur...

Страница 43: ...e rack CAUTION This system requires three people to install the system into the rack P7EF3502 2 1 D A C Figure 30 Sliding the cable management arm tab into the mounting bracket slot P7EF3503 1 2 E D Figure 31 Sliding the other cable management arm tab into the extension bracket Installing the IBM Power System S822L 8247 22L 27 ...

Страница 44: ...ipping cover on the rear and the front of the system if present 2 Extend the slide rails forward 1 until they click twice into place Carefully lift the server and tilt it into position over the slide rails so that the rear nail heads 2 on the server line up with the rear slots 3 on the slide rails Slide the server down until the rear nail heads slip into the two rear slots Then slowly lower the fr...

Страница 45: ...turn hoses complete the following step Press the hose end of the quick connect onto the manifold end until it clicks into place Note Connect one hose to the inner circuit of the manifold and the other hose to the outer circuit of the manifold 2 P8EG1501 0 1 Figure 33 Install the server into the rack Figure 34 Installing the quick connects to the supply and return hoses Installing the IBM Power Sys...

Страница 46: ...gement arm so that the hoses will not be kinked if the cable management arm extends Note Ensure that the hoses do not extend past the plane of the rack door Turning on the water source and bleeding air from the system You must turn on the water source in your location so that the water flows to the rack You can turn on the cooling distribution unit CDU after you have connected the manifold to your...

Страница 47: ...e about choosing a console type Go to the instructions for the applicable console interface or terminal in the following table Table 4 Available console types Console type Operating system Logical partitions Cable required Cabling setup instructions ASCII terminal AIX Linux or VIOS Yes for VIOS no for AIX and Linux Serial cable equipped with a null modem Cabling the server with an ASCII terminal o...

Страница 48: ...e The green power status indicator on the front control panel is flashing and the dc out indicator lights on the power supplies are flashing If none of the indicators are flashing check the power cord connections 3 Wait for the green light on the control panel to start flashing 4 Ensure that your ASCII terminal is set to the following general attributes These attributes are the default settings fo...

Страница 49: ...he navigation area click Updates 2 In the work area view and record the information that appears in the HMC Code Level section including the HMC version release Service Pack build level and base versions To cable the server to the HMC complete the following steps 1 If you want to directly attach your HMC to the managed system connect Ethernet Connector 1 on the HMC to the HMC1 port on the managed ...

Страница 50: ...te for the type of partition on which you are installing the Integrated Virtualization Manager For an AIX or Linux partition complete the following steps to change the partition boot mode 1 In the navigation area expand Power Restart Control 2 Click Power On Off System 3 Select Boot to SMS menu in the AIX or Linux partition mode by boot field 4 If you are installing the Integrated Virtualization M...

Страница 51: ... steps a Plug the power cord into the power supply b Plug the system power cords and the power cords for any other attached devices into the power source c If your system uses a power distribution unit PDU complete the following steps 1 Connect the system power cords from the server and I O drawers to the PDU with an IEC 320 type receptacle 2 Attach the PDU input power cord and plug it into the po...

Страница 52: ...is procedure to complete the server setup To complete the server setup without using a management console complete the following steps 1 Attach the server to the rack using the shipping screws that were provided with your system 2 To check the firmware level on the managed system and to update the time of day complete the following steps a Access the Advanced System Management Interface ASMI For i...

Страница 53: ...or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging your hardware v When you use an ESD wrist strap follow all electrical safety procedures An ESD wrist strap is used for static control It does not increase or decrease your risk of receiving electric shock when using or working on electrical equipment v If you do not have an ESD wrist strap just p...

Страница 54: ...cation to view the service and support contact information Removing the shipping bracket and connecting power cords and power distribution unit PDU for your preinstalled server Before you set up a console you must remove the shipping brackets and connect power cords Attention v Attach an electrostatic discharge ESD wrist strap to the front ESD jack to the rear ESD jack or to an unpainted metal sur...

Страница 55: ...nd loop fasteners B b Connect the system power cords from the server and I O drawers to the PDU with an IEC 320 type receptacle c Attach the PDU input power cord and plug it into the power source P8EG1510 1 Figure 37 Removing the shipping brackets from the rear of the chassis Figure 38 Plugging the power cords into the power supply and attaching cables to the power supply handles Installing the IB...

Страница 56: ... choosing a console type Go to the instructions for the applicable console interface or terminal in the following table Table 6 Available console types Console type Operating system Logical partitions Cable required Cabling setup instructions ASCII terminal AIX Linux or VIOS Yes for VIOS no for AIX and Linux Serial cable equipped with a null modem Cabling the server with an ASCII terminal on page ...

Страница 57: ...after a data word byte 3 Press a key on the ASCII terminal to allow the service processor to confirm the presence of the ASCII terminal 4 When the login display appears for the ASMI enter admin for the user ID and password 5 Change the default password when you are prompted 6 Press Enter until the server information appears You have completed the setup for an ASCII terminal and have started the AS...

Страница 58: ...mation about how to set media speeds see Setting the media speed http www ibm com support knowledgecenter POWER8 p8hai lanmediaspeed htm 3 If you are connecting a second HMC to your managed server connect it to the Ethernet port that is labeled HMC2 on the managed server 4 Continue with Routing cables through the cable management arm and connecting expansion units on page 44 Cabling the server and...

Страница 59: ...t Continue to operating system in the AIX or Linux partition mode boot field 4 Click Save settings 3 Insert the Virtual I O Server CD or DVD into the optical drive 4 In SMS select the CD or DVD as the boot device a Select Select Boot Options and press Enter b Select Select Install Boot Device and press Enter c Select CD DVD and press Enter d Select the media type that corresponds to the optical de...

Страница 60: ...an open virtualization solution that is offered for the Power scale out family of Linux servers built on POWER8 technology PowerKVM delivers server virtualization based on open source Kernel based Virtual Machine KVM Linux technology PowerKVM virtualization technology enables you to share real compute memory and I O resources through server virtualization These virtual resources are used by virtua...

Страница 61: ...MC http www ibm com support knowledgecenter POWER8 p8haj startsysnohmc htm 3 Install an operating system and update the operating system v Install the AIX operating system For instructions see Installing AIX http www ibm com support knowledgecenter POWER8 p8hdx p8hdx_installaix htm v Install the Linux operating system For instructions see Installing Linux http www ibm com support knowledgecenter P...

Страница 62: ...46 Power Systems Installing the IBM Power System S822L 8247 22L ...

Страница 63: ...refore this statement may not apply to you This information could include technical inaccuracies or typographical errors Changes are periodically made to the information herein these changes will be incorporated in new editions of the publication IBM may make improvements and or changes in the product s and or the program s described in this publication at any time without notice Any references in...

Страница 64: ...ta in sensitive or critical operations Users should periodically check IBM s support websites for updated information and fixes applicable to the system and related software Homologation statement This product may not be certified in your country for connection by any means whatsoever to interfaces of public telecommunications networks Further certification may be required by law prior to making a...

Страница 65: ...y www ibm com able Privacy policy considerations IBM Software products including software as a service solutions Software Offerings may use cookies or other technologies to collect product usage information to help improve the end user experience to tailor interactions with the end user or for other purposes In many cases no personally identifiable information is collected by the Software Offering...

Страница 66: ...to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits IBM is not responsible for any radio or television interference caused by using other than recom...

Страница 67: ...ference may occur in which case the user may be required to take corrective actions Japan Electronics and Information Technology Industries Association Statement This statement explains the Japan JIS C 61000 3 2 product wattage compliance This statement explains the Japan Electronics and Information Technology Industries Association JEITA statement for products less than or equal to 20 A per phase...

Страница 68: ...eed to perform practical action Electromagnetic Interference EMI Statement Taiwan The following is a summary of the EMI Taiwan statement above Warning This is a Class A product In a domestic environment this product may cause radio interference in which case the user will be required to take adequate measures IBM Taiwan Contact Information 52 Power Systems Installing the IBM Power System S822L 824...

Страница 69: ...g kann im Wohnbereich Funk Störungen verursachen in diesem Fall kann vom Betreiber verlangt werden angemessene Maßnahmen zu ergreifen und dafür aufzukommen Deutschland Einhaltung des Gesetzes über die elektromagnetische Verträglichkeit von Geräten Dieses Produkt entspricht dem Gesetz über die elektromagnetische Verträglichkeit von Geräten EMVG Dies ist die Umsetzung der EU Richtlinie 2014 30 EU in...

Страница 70: ...nto an outlet on a circuit different from that to which the receiver is connected v Consult an IBM authorized dealer or service representative for help Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits Proper cables and connectors are available from IBM authorized dealers IBM is not responsible for any radio or television interference caused by ...

Страница 71: ...ation Statement This statement explains the Japan JIS C 61000 3 2 product wattage compliance This statement explains the Japan Electronics and Information Technology Industries Association JEITA statement for products less than or equal to 20 A per phase This statement explains the JEITA statement for products greater than 20 A single phase This statement explains the JEITA statement for products ...

Страница 72: ...ohne Zustimmung von IBM verändert bzw wenn Erweiterungskomponenten von Fremdherstellern ohne Empfehlung von IBM gesteckt eingebaut werden Deutschland Einhaltung des Gesetzes über die elektromagnetische Verträglichkeit von Geräten Dieses Produkt entspricht dem Gesetz über die elektromagnetische Verträglichkeit von Geräten EMVG Dies ist die Umsetzung der EU Richtlinie 2014 30 EU in der Bundesrepubli...

Страница 73: ...roprietary notices are preserved You may not make derivative works of these publications or reproduce distribute or display these publications or any portion thereof outside your enterprise without the express consent of IBM Rights Except as expressly granted in this permission no other permissions licenses or rights are granted either express or implied to the publications or any information data...

Страница 74: ...58 Power Systems Installing the IBM Power System S822L 8247 22L ...

Страница 75: ......

Страница 76: ...IBM Part Number 01LK526 Printed in USA GI11 9908 06 1P P N 01LK526 ...

Отзывы: