7.
While you pull the slide rail forward, ensure that all three pins protrude through the rack holes, then
push the front latch (2) all the way in. For details, see Figure 23.
Note:
If you must reposition the rail, release the front latch (2), and while you press the blue pin at
the bottom, push the rail up and toward the rear to release from the rack.
8.
Repeat these steps to install the right rail into the rack.
Installing the cable-management arm
The cable-management arm is used to efficiently route cables so that you have proper access to the rear
of the system. Use the procedure to install the cable-management arm.
To install the cable-management arm, complete the following steps:
1.
Ensure that you have the following parts.
Item Description
▌A▐
Support arm
▌B▐
Cable-management stop bracket
▌C▐
Mounting bracket
▌D▐
Cable-management arm
▌E▐
Extension bracket
Figure 23. Latch seated on the front rail of the rack
Installing the IBM Power System S822L (8247-22L)
23
Содержание Power System 8247-22L
Страница 1: ...Power Systems Installing the IBM Power System S822L 8247 22L GI11 9908 06 IBM ...
Страница 2: ......
Страница 3: ...Power Systems Installing the IBM Power System S822L 8247 22L GI11 9908 06 IBM ...
Страница 16: ...xiv Power Systems Installing the IBM Power System S822L 8247 22L ...
Страница 62: ...46 Power Systems Installing the IBM Power System S822L 8247 22L ...
Страница 74: ...58 Power Systems Installing the IBM Power System S822L 8247 22L ...
Страница 75: ......
Страница 76: ...IBM Part Number 01LK526 Printed in USA GI11 9908 06 1P P N 01LK526 ...