54
IBM Netfinity FAStT500 RAID Controller Enclosure Unit User’s Reference
Attention: When you handle electrostatic discharge (ESD) sensitive devices, take
precautions to avoid damage from static electricity. For details about
handling ESD-sensitive devices, refer to the following Web site and use a
search term of ESD: http://www.ibm.com/
4 Unpack the new GBIC; then, do the following:
a Remove the protective cap from the GBIC.
b If the GBIC you are installing has a metal latch, move the metal latch to the
unlocked (center) position.
c Slide the GBIC into the mini-hub port.
d Rotate the metal latch outward to the locked position (flush with the rear of the
GBIC).
5 Reconnect the interface cables that you removed in
.
6 Check the indicator lights on the mini-hub.
When the mini-hub is operating properly, the green loop good light is on and the fault
light is off. If the mini-hub is connected to a Fibre Channel loop, the amber port bypass
light is off. If a problem is indicated, use the storage-management software to check
the controller unit status.
Содержание Netfinity FASt T500
Страница 1: ......
Страница 2: ......
Страница 3: ...Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 12: ...x IBM Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 16: ...xiv IBM Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 20: ...xviii IBM Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 28: ...8 IBM Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 48: ...28 IBM Netfinity FAStT500 RAID Controller Enclosure Unit User s Reference...
Страница 91: ...Part Number 19K8461 Printed in U S A April 2000 19K8461...