Before you begin
Before you begin
Site preparation
The location and conditions of the place where you decide to install the CN1610
must conform to the following guidelines:
u
The location must be clean, dry, and well ventilated.
u
The location must meet the specifications described in “
u
The installation site must have sufficient space to allow access to the front
and back panels of the switch.
u
The system and port LEDs must be visible.
u
The power cord must be able to reach from the power socket on the switch to
a properly-grounded power source.
u
The cable length from the copper Ethernet port to the connected device must
not exceed 328 feet (100 meters).
u
The cable length from the SFP ports must not exceed recommended lengths
for the cable and transceiver module type.
u
The ventilation holes on the front and rear panels must not be obstructed in
order to provide proper airflow through the switch.
u
The cabling must be routed away from sources of electrical interference such
as power lines and fluorescent lighting fixtures.
Verify package
contents
The CN1610 package includes the following contents:
u
CN1610 switch
u
Software license and warranty information
u
Rack-mount installation kit
u
RJ45 to DB-9 console cable
u
Four SFP+ direct attach copper cables
Power cables are a separate item and not included in this package. If any item is
missing or damaged, contact your authorized IBM N series sales representative
immediately.
The following table lists the parts included in the slide rail box:
Содержание N Series
Страница 1: ...IBM System Storage N series 10G Cluster Mode Switch Installation Guide GI13 2866 00 NA 210 06282_B0 ...
Страница 6: ...vi 10G Cluster Mode Switch Installation Guide ...
Страница 8: ...2 Table of Contents ...
Страница 10: ...4 About this guide ...
Страница 26: ...20 Technical specifications ...
Страница 56: ...50 Glossary ...
Страница 60: ...54 Index ...
Страница 61: ......
Страница 62: ... NA 210 06282_B0 Printed in USA GI13 2866 00 ...