Checking Building Power
1 Checking the receptacle for wiring errors
DANGER
If the receptacle has a metal shell, do
not touch the shell until you have
completed the voltage and
grounding/earthing
checks below. Improper wiring or
grounding/earthing
could place dangerous voltage on the
metal shell.
If any of the conditions are not as
described, STOP. Contact the customer
to have improper voltage or impedance
conditions corrected before proceeding.
The receptacle the customer uses to supply power
to the frames will be tested in the following steps.
Perform the following
AC voltage checks
with the
wall breaker OFF.
1. Using the CE meter, check to be sure there
is no ac voltage between each phase pin
and the ground/earth
pin (and receptacle shell, if metal).
2. Using the CE meter, check to be sure there
is no ac voltage from receptacle
ground/earth to building ground/earth
(water pipe, building steel, grounded raised
floor panels, etc.). For metal receptacle
shells, check for no ac voltage from the
receptacle ground/earth
pin to the metal shell.
Chapter 1. Beginning the Installation
1-3
Содержание Multiprise 3000 S/390
Страница 1: ...S 390 Multiprise 3000 Enterprise Server R IBM Installation Manual SY24 6154 03...
Страница 2: ......
Страница 3: ...S 390 IBM Installation Manual SY24 6154 03...
Страница 8: ...vi Installing the System...
Страница 14: ...xii Installing the System...
Страница 34: ...1 20 Installing the System...
Страница 40: ...2 6 Installing the System...
Страница 78: ...5 20 Installing the System...
Страница 156: ...6 78 Installing the System...
Страница 160: ...7 4 Installing the System...
Страница 172: ...B 4 Installing the System...
Страница 173: ......
Страница 174: ...IBM Printed in the United States of America on recycled paper containing 10 recovered post consumer fiber SY24 6154 3...
Страница 175: ...Spine information IBM S 390 Installation Manual...