Hot-Pluggable
FRUs
Notes:
1.
The
Linux
operating
system
does
not
support
some
hot-pluggable
procedures.
2.
Linux
does
not
support
hot-plugging
any
hot-pluggable
PCI
adapters
or
devices.
A
system
with
Linux
installed
on
one
or
more
partitions
must
be
shutdown
and
powered
off
before
replacing
any
PCI
adapter
or
device
assigned
to
a
Linux
partition.
Follow
the
non-hot-pluggable
adapter
or
device
procedures
when
replacing
a
PCI
adapter
or
device
in
any
partition
with
Linux
installed.
3.
You
do
not
have
to
power
off
the
system
to
remove
a
hot-pluggable
FRU
from
the
processor
subsystem
or
from
I/O
subsystems.
FRUs
can
be
considered
as
not
concurrently
replaceable,
concurrently
replaceable
with
hot
plug,
or
concurrently
replaceable.
The
following
table
indicates
which
FRUs
are
hot-pluggable
or
non-hot-pluggable.
Each
FRU
shown
is
identified
as
available
for
concurrent
maintenance
if
applicable.
Processor
Subsystem
FRUs
Hot-Pluggable
Concurrent
Maintenance
Notes
Blowers
Yes
Processor
subsystem
and
power
blowers
can
be
replaced
with
power
on,
follow
the
appropriate
removal
and
replacement
procedures.
DCA
Yes
DCAs
can
be
replaced
with
power
on,
follow
the
appropriate
removal
and
replacement
procedures.
Bulk
Power
Enclosure
Yes
One
Bulk
Power
Enclosure
can
be
replaced
with
the
system
running,
follow
the
appropriate
removal
and
replacement
procedures.
Note:
If
you
use
the
Start
Service
button
and
the
ENBL
(Good)
LEDs
on
the
enclosure
components
do
not
go
off,
do
not
proceed.
Contact
the
customer
and
schedule
a
time
for
replacement
of
the
enclosure
with
power
off.
Bulk
Power
Controller
(BPC)
Yes
BPCs
can
be
replaced
with
power
on,
follow
the
appropriate
removal
and
replacement
procedures.
Bulk
Power
Regulator
(BPR)
Yes
BPRs
can
be
replaced
with
power
on,
follow
the
appropriate
removal
and
replacement
procedures.
Bulk
Power
Distributor
(BPD)
Yes
BPDs
can
be
replaced
with
power
on,
follow
the
appropriate
removal
and
replacement
procedures.
UEPO
Switch
panel
Yes
UEPO
Switch
panel
can
be
replaced
with
power
on,
follow
the
appropriate
removal
and
replacement
procedures.
BPF
Yes
BPF
can
be
replaced
with
power
on,
follow
the
appropriate
removal
and
replacement
procedures.
IBF
Yes
IBF
can
be
replaced
with
power
on,
follow
the
appropriate
removal
and
replacement
procedures.
Capacitor
book
No
Processor
subsystem
chassis
No
MCM
No
Memory
cards
No
L3
cache
No
Clock
card
No
I/O
books
No
858
Eserver
pSeries
690
Service
Guide
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 2: ......
Страница 3: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 12: ...x Eserver pSeries 690 Service Guide...
Страница 14: ...xii Eserver pSeries 690 Service Guide...
Страница 228: ...Step 1527 5 Call your next level of support 212 Eserver pSeries 690 Service Guide...
Страница 357: ...Step 1543 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 341...
Страница 362: ...Step 1545 15 Call for support This ends the procedure 346 Eserver pSeries 690 Service Guide...
Страница 365: ...Step 1546 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 349...
Страница 381: ...Step 154A 14 Turn off the power Chapter 3 Maintenance Analysis Procedures 365...
Страница 430: ...414 Eserver pSeries 690 Service Guide...
Страница 798: ...782 Eserver pSeries 690 Service Guide...
Страница 868: ...Media Subsystem Internal Cables 1021 p690 Cable Installation and Management 1022 852 Eserver pSeries 690 Service Guide...
Страница 910: ...MCM Installation Shorts Test Step 3 See L3 Cache Modules on page 898 894 Eserver pSeries 690 Service Guide...
Страница 923: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 907...
Страница 924: ...L3 Cache Shorts Test Step 5 908 Eserver pSeries 690 Service Guide...
Страница 926: ...L3 Cache Shorts Test Step 2 910 Eserver pSeries 690 Service Guide...
Страница 928: ...L3 Cache Shorts Test Step 4 912 Eserver pSeries 690 Service Guide...
Страница 929: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 913...
Страница 1055: ...7040 Model 681 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 1039...
Страница 1057: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 1041...
Страница 1061: ...Power Cabling Chapter 10 Parts Information 1045...
Страница 1090: ...1074 Eserver pSeries 690 Service Guide...
Страница 1094: ...1078 Eserver pSeries 690 Service Guide...
Страница 1109: ...error Handle unexpected modem responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix D Modem Configurations 1093...
Страница 1122: ...1106 Eserver pSeries 690 Service Guide...
Страница 1123: ...Appendix E Ground Path The ground path for the pSeries 690 is shown in the following figure 1107...
Страница 1124: ...1108 Eserver pSeries 690 Service Guide...
Страница 1132: ...1116 Eserver pSeries 690 Service Guide...
Страница 1133: ......
Страница 1134: ...Printed in U S A February 2004 SA38 0589 05...