Chapter
3.
Placing
the
cabinets
This
chapter
provides
information
about
the
placement
of
the
cluster
cabinets
and
how
to
install
the
frame
stabilizer
foot
to
support
each
cabinet.
Physical,
environmental,
and
electrical
requirements
are
outlined
in
the
IBM
Eserver
Cluster
1350
Preinstallation
Planning
Guide
.
Do
not
move
the
cabinets
to
the
installation
location
until
the
location
is
ready.
Customer
responsibilities
After
you
have
verified
the
contents
of
all
the
cabinets
of
the
Cluster
1350,
move
the
cabinets
and
any
boxes
containing
extra
equipment
and
other
materials
to
the
location
that
you
have
prepared
for
the
installation.
The
Cluster
1350
is
manufactured
according
to
the
information
that
you
provided
at
the
time
you
placed
the
order.
The
side-to-side
and
front-to-back
clearances
for
each
cabinet
are
directly
related
to
the
load-carrying
capability
of
the
floor
in
the
installation
location.
Cabinet-to-cabinet
cabling
harnesses
are
custom
made
for
each
order
according
to
the
planned
spacing
of
the
cabinets.
If
the
location
of
the
installation
changes
from
the
location
at
the
order
time,
review
the
physical,
environmental,
and
electrical
requirements
outlined
in
the
preinstallation
manual
to
make
sure
that
there
are
no
incompatibilities.
Using
the
information
in
the
packing
slip
enclosed
with
the
Cluster
1350,
place
the
cabinets
in
their
approximate
final
locations.
Each
cabinet
has
installation
labels
to
help
you
in
this
process.
The
IBM
support
team
determines
the
final
cabinet
placement
and
completes
the
cabling
and
installation
steps.
Installer
responsibilities
The
instructions
in
this
section
are
intended
only
for
the
IBM
support
team
who
will
complete
the
installation.
Use
the
following
guidelines
when
placing
the
cabinets:
v
Cabinets
can
be
placed
side-by-side
in
contact
with
one
another.
Remember
that
to
service
any
power
distribution
unit
(PDU)
in
a
cabinet,
you
must
remove
the
side
covers.
At
least
30
inches
of
working
clearance
is
required
to
ensure
the
safe
removal
of
a
side
cover
and
provide
access
to
the
PDU.
If
the
cabinets
are
placed
side-by-side
in
contact
with
each
other,
leave
enough
extra
space
around
the
cluster
so
that
you
can
move
the
cabinets
if
a
PDU
needs
service.
Cabinet
placement
must
not
exceed
floor-loading
limits.
v
Cabinet
placement
must
allow
for
access
to
both
the
front
and
back
panels.
At
least
36
inches
of
working
clearance
is
needed
to
remove
or
insert
a
module
into
the
rack.
v
Cables
and
cable
harnesses
are
custom
made
to
fit
the
order.
If
the
location
of
the
installation
has
changed
since
the
time
the
order
was
placed,
review
the
physical,
environmental,
and
electrical
requirements
outlined
in
the
preinstallation
manual
to
make
sure
that
there
are
no
incompatibilities.
v
Make
sure
that
the
cabinets
are
arranged
correctly
and
adjust
them
if
necessary.
See
the
packing
slip
and
the
cabinet
labels
to
verify
that
all
cabinets
are
in
their
correct
locations.
©
Copyright
IBM
Corp.
2004
11
Содержание eserver Cluster 1350
Страница 1: ...IBM Eserver Cluster 1350 Installation and Service Guide ERserver...
Страница 2: ......
Страница 3: ...IBM Eserver Cluster 1350 Installation and Service Guide ERserver...
Страница 26: ...10 IBM Eserver Cluster 1350 Installation and Service Guide...
Страница 82: ...66 IBM Eserver Cluster 1350 Installation and Service Guide...
Страница 86: ...70 IBM Eserver Cluster 1350 Installation and Service Guide...
Страница 88: ...72 IBM Eserver Cluster 1350 Installation and Service Guide...
Страница 90: ...74 IBM Eserver Cluster 1350 Installation and Service Guide...
Страница 94: ...78 IBM Eserver Cluster 1350 Installation and Service Guide...
Страница 98: ...82 IBM Eserver Cluster 1350 Installation and Service Guide...
Страница 104: ...88 IBM Eserver Cluster 1350 Installation and Service Guide...
Страница 114: ...98 IBM Eserver Cluster 1350 Installation and Service Guide...
Страница 120: ...104 IBM Eserver Cluster 1350 Installation and Service Guide...
Страница 121: ......
Страница 122: ...Part Number 25K8407 Printed in USA 1P P N 25K8407...