![IBM 4002-C4A Скачать руководство пользователя страница 79](http://html1.mh-extra.com/html/ibm/4002-c4a/4002-c4a_installation-and-user-manual_3383060079.webp)
configuration commands to remove the configuration information, then
use configuration commands to create the configuration information you
want. Command option 30 erases the entire running-config and replaces
it with the new configuration file.
Erasing image and configuration files
To erase software images or configuration files, use the commands described
below. These commands are valid at the Privileged EXEC level of the CLI.
v
erase flash primary
erases the image stored in primary flash of the system.
v
erase flash secondary
erases the image stored in secondary flash of the
system.
v
erase startup-config
erases the configuration stored in the startup configuration
file; however, the running configuration remains intact until system reboot.
Scheduling a system reload
In addition to reloading the switch manually, you can configure the system to reload
itself at a specific time or after a specific amount of time has passed.
Note:
The scheduled reload feature requires the system clock. You can use a
Simple Network Time Protocol (SNTP) server to set the clock or you can set
the device clock manually.
Reloading at a specific time
To schedule a system reload for a specific time, use one of the following methods.
To schedule a system reload from the primary flash module for 6:00:00 AM, January
19, 2006, enter the following command at the Privileged EXEC level of the CLI:
NetIron# reload at 06:00:00 01-19-06
Syntax:
reload at
<hh:mm:ss> <mm-dd-yy>
[primary | secondary]
<hh:mm:ss>
is the hours, minutes, and seconds.
<mm-dd-yy>
is the month, day, and year.
primary | secondary
specifies whether the reload is to occur from the primary code
flash module or the secondary code flash module. The default is
primary
.
Reloading after a specific amount of time
To schedule a system reload to occur after a specific amount of time has passed on
the system clock, use one of the following methods.
To schedule a system reload from the secondary flash one day and 12 hours later,
enter the following command at the Privileged EXEC level of the CLI:
NetIron# reload after 01:12:00 secondary
Syntax:
reload after
<dd:hh:mm> [
primary | secondary
]
<dd:hh:mm>
is the number of days, hours, and minutes.
primary | secondary
specifies whether the reload is to occur from the primary code
flash image or the secondary code flash image.
Chapter 7. Upgrading software images and configuration files
55
Содержание 4002-C4A
Страница 2: ......
Страница 8: ...vi IBM Ethernet Switch c series Installation and User Guide ...
Страница 10: ...viii IBM Ethernet Switch c series Installation and User Guide ...
Страница 12: ...x IBM Ethernet Switch c series Installation and User Guide ...
Страница 26: ...2 IBM Ethernet Switch c series Installation and User Guide ...
Страница 37: ...net48bc013 Figure 8 AC power supply net48bc014 Figure 9 Power supply installation Chapter 3 Installation 13 ...
Страница 39: ...net48bc017 Figure 10 Front rack mount position Chapter 3 Installation 15 ...
Страница 41: ...net48bc019 Figure 12 Mid rack mount position Chapter 3 Installation 17 ...
Страница 60: ...36 IBM Ethernet Switch c series Installation and User Guide ...
Страница 68: ...44 IBM Ethernet Switch c series Installation and User Guide ...
Страница 82: ...58 IBM Ethernet Switch c series Installation and User Guide ...
Страница 93: ......
Страница 94: ... Part Number 45W3139 Printed in USA GC27 2238 00 1P P N 45W3139 80218 001 ...