5.
Check
inside
the
SAN
Volume
Controller
for
any
obvious
unsafe
conditions,
such
as
metal
particles,
contamination,
water
or
other
fluids,
or
marks
of
overheating,
fire,
or
smoke
damage.
6.
Check
for
worn,
damaged,
or
pinched
cables.
7.
Ensure
that
the
voltage
that
is
specified
on
the
product-information
label
matches
the
specified
voltage
of
the
electrical
power
outlet.
If
necessary,
verify
the
voltage.
8.
Inspect
the
power
supply
assemblies
and
check
that
the
fasteners
(screws
or
rivets)
in
the
cover
of
the
power-supply
unit
have
not
been
removed
or
disturbed.
9.
Before
connecting
the
SAN
Volume
Controller
to
the
SAN,
check
the
grounding.
External
machine
check
Ensure
that
you
perform
an
external
machine
check
before
you
install
the
SAN
Volume
Controller.
Perform
the
following
steps
to
conduct
an
external
machine
check:
1.
Verify
that
all
external
covers
are
present
and
are
not
damaged.
2.
Ensure
that
all
latches
and
hinges
are
in
the
correct
operating
condition.
3.
If
the
SAN
Volume
Controller
is
not
installed
in
a
rack
cabinet,
check
for
loose
or
broken
feet.
4.
Check
the
power
cord
for
damage.
5.
Check
the
external
signal
cable
for
damage.
6.
Check
the
cover
for
sharp
edges,
damage,
or
alterations
that
expose
the
internal
parts
of
the
device.
7.
Correct
any
problems
that
you
find.
Internal
machine
checks
Ensure
that
you
perform
an
internal
machine
check
before
you
install
the
SAN
Volume
Controller.
Perform
the
following
steps
to
conduct
the
internal
machine
check:
1.
Check
for
any
non-IBM
changes
that
might
have
been
made
to
the
machine.
If
any
are
present,
obtain
the
“Non-IBM
Alteration
Attachment
Survey,”
form
number
R009,
from
the
IBM
branch
office.
Complete
the
form
and
return
it
to
the
branch
office.
2.
Check
the
condition
of
the
inside
of
the
machine
for
any
metal
or
other
contaminants,
or
any
indications
of
water,
other
fluid,
fire,
or
smoke
damage.
3.
Check
for
any
obvious
mechanical
problems,
such
as
loose
components.
4.
Check
any
exposed
cables
and
connectors
for
wear,
cracks,
or
pinching.
Checking
the
grounding
of
the
SAN
Volume
Controller
2145-8F4
and
the
2145
UPS-1U
Ensure
that
you
understand
how
to
check
the
grounding
of
the
SAN
Volume
Controller
2145-8F4
and
the
2145
uninterruptible
power
supply-1U
(2145
UPS-1U).
Perform
the
following
steps
to
ensure
that
the
SAN
Volume
Controller
2145-8F4
is
properly
grounded:
1.
Ensure
that
all
power
is
removed.
About
this
guide
xiii
|
|
|
|
|
|
|
Содержание 2145-4F2
Страница 1: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Страница 2: ......
Страница 3: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Страница 8: ...vi IBM System Storage SAN Volume Controller Installation Guide...
Страница 74: ...44 IBM System Storage SAN Volume Controller Installation Guide...
Страница 78: ...48 IBM System Storage SAN Volume Controller Installation Guide...
Страница 120: ...90 IBM System Storage SAN Volume Controller Installation Guide...
Страница 122: ...92 IBM System Storage SAN Volume Controller Installation Guide...
Страница 128: ...98 IBM System Storage SAN Volume Controller Installation Guide...
Страница 134: ...104 IBM System Storage SAN Volume Controller Installation Guide...
Страница 138: ...108 IBM System Storage SAN Volume Controller Installation Guide...
Страница 141: ......
Страница 142: ...Part Number 31P0797 Printed in USA GC26 7900 00 1P P N 31P0797...
Страница 143: ...Spine information IBM System Storage SAN Volume Controller Installation Guide Version 4 1 0...