7
C H A P T E R
2
Installation
The following tasks to set up and configure the appliance are described in this chapter:
1.
Unpack the appliance and verify that all components are present and in good condition. See
“Required items” on page 9.
2.
Make the needed mouse setting adjustments on each target device to be connected. See
“Required adjustments to mouse and cursor settings” on page 10.
3.
Read and follow the “Safety precautions” on page 10.
4.
Rack mount the appliance. See “Rack mounting the appliance” on page 13.
5.
Make all hardware connections between the power source, appliance, local user station, target
devices, and the Ethernet network. See the following sections:
•
“Connecting hardware to the appliance” on page 16
•
“Daisy chaining” on page 17
•
“Appliance tiering” on page 17
See also the
Quick Installation Guide
.
6.
After turning on the power, verify that all connections are working. See “Verifying Ethernet
connections” on page 16.
7.
Configure access to the appliance. See “Configuration options and default authentication” on
page 21.
Содержание 17352GX
Страница 2: ......
Страница 3: ...Global 2x16 Console Manager Global 4x16 Console Manager Installation and User s Guide...
Страница 4: ......
Страница 5: ......
Страница 7: ......
Страница 8: ......
Страница 16: ...xiv Global Console Manager Installation and User s Guide...
Страница 27: ...Chapter 2 Installation 11...
Страница 104: ...88 Global Console Manager Installation and User s Guide...
Страница 122: ...106 Global Console Switch Installer and User Guide Japanese Voluntary Control Council for Interference VCCI statement...
Страница 134: ...118 Global Console Switch Installer and User Guide...
Страница 135: ......
Страница 136: ...43V6037 590527501C...