background image

Removing the shipping bracket from the UPS

If the UPS was shipped installed in a rack cabinet, a shipping bracket is installed to provide extra
protection for the UPS during shipment. Before using the UPS, remove the shipping bracket on the front
of the UPS.

To remove the shipping bracket, complete the following steps:

1.

If the UPS lower front bezel is installed, remove it. Press the two side latches toward each other to
release the bezel, and pull the bezel away. Keep the bezel.

OK

OK

100%

6

min

2.

Remove the four screws that secure the shipping bracket and the UPS to the rack cabinet. Keep the
four screws.

OK

OK

100%

6

min

Shipping bracket

3.

Remove the shipping bracket and save it in case you have to ship the UPS in the rack cabinet in the
future.

4.

Secure the front of the UPS to the rack cabinet with the four screws that you removed in step 2.

5.

If you are connecting the UPS internal batteries, see the

Installation and Maintenance Guide

on the IBM

Documentation

CD that comes with the UPS.

6.

To attach the UPS lower front bezel, press the two side latches toward each other, align the bezel
underneath the upper bezel, and snap it into place.

11

Содержание 11000 VA LCD 5U

Страница 1: ...95 F v Do not block any air vents usually 15 cm 6 in of air space provides proper airflow v Plan the device installation starting from the bottom of the rack cabinet v Install the heaviest device in...

Страница 2: ...ge v Disconnect the attached power cords telecommunications systems networks and modems before you open the device covers unless instructed otherwise in the installation and configuration procedures v...

Страница 3: ...rack cabinet complete the following steps 1 For racks with round holes only Install one adapter plate on each of the ends of the right and left rails a Locate the four adapter plates that come in the...

Страница 4: ...S or extended battery module 4 Secure each rail to the front of the rack with two M5 x 16 mm screws Make sure that the rails are on the inside of the rack cabinet mounting flanges and the letter on ea...

Страница 5: ...humbscrew on the right battery retention bracket 1 slide the bracket to the left 2 rotate the bracket out 3 and then remove it R c Remove the left internal battery module Important Each internal batte...

Страница 6: ...nded battery module handling requirements Machine type model or part number Product description Weight Handling requirement 5395 9KX 11000 VA 5U rack UPS 35 kg 77 lb without internal battery modules T...

Страница 7: ...of arcing might occur when you connect the batteries This is normal and does not damage the unit or present any safety concern c Reinstall the right battery retention bracket 1 Slide the right battery...

Страница 8: ...left battery retention bracket 4 12 Install the bezel v For a UPS a Locate the upper and lower bezels that come with the UPS The upper bezel has an opening for the liquid crystal display LCD b To inst...

Страница 9: ...e LCD on the front of the UPS For more information about installing and operating the UPS and extended battery module see the Installation and Maintenance Guide that comes with the UPS Important Befor...

Страница 10: ...6 min 2 Make sure that the UPS internal batteries are disconnected For more information see the Installation and Maintenance Guide on the IBM Documentation CD that comes with the UPS 3 Remove the fou...

Страница 11: ...ezel OK OK 100 6 min 2 Remove the four screws that secure the shipping bracket and the UPS to the rack cabinet Keep the four screws OK OK 100 6 min Shipping bracket 3 Remove the shipping bracket and s...

Страница 12: ...ited States other countries or both Other company product or service names may be trademarks or service marks of others Printed in USA Copyright IBM Corporation 2011 US Government Users Restricted Rig...

Отзывы: