Installation & Commissioning Report
Model Number _____________________ Serial Number ________________________________
Date of Installation ________ Address of installation ____________________________________
User contact information __________________________________________________________
Installer Information (Company & Address)_____________________________________________
Phone/Fax/E-mail ________________________________________________________________
Fuel:
□
Natural Gas
□
Propane
Gas Supply Pressure (high fire) ____ Inches w.c. Measured Rate of Input (high fire) _____Btu/hr
□
Leak testing completed
□
Gas piping
□
Venting system
□
Fan
□
combustion components
□
System Cleaned and Flushed (type of cleaner used) __________________________________
□
System Filled (type/concentration of any glycol/chemicals used) _________________________
□
Air purge completed
□
Relief Valve correctly installed and piped Relief valve “try lever” test performed
□
Condensate trap filled Condensate drain clear and free flowing Condensate Neutralization.
□
Ignition Safety Shutoff test completed. Flame current - High fire _____ µA - Low fire _____ µA
□
Owner advised and instructed in the safe operation and maintenance of the boiler and system.
□
Information regarding the appliance and installation received and left with owner
Combustion Readings: CO
2
_____________ % O
2
______________ % CO ____________ ppm
Flue temperature ___ Return water temperature (measure simultaneously with flue temp.) _____
Commissioning has been completed as listed on this report - Installer's Signature _____________
Installers: send this completed sheet - Fax to 604 877 0295 - or - scan and Email to
[email protected].
117
Installation & Commissioning Report
Содержание SL SERIES
Страница 8: ...Intentionally left empty...
Страница 14: ...Intentionally left empty...
Страница 66: ...Figure 49 Electric wiring connections 62 Section Installation...
Страница 78: ...Intentionally left empty...
Страница 92: ...Intentionally left empty...
Страница 105: ...101 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 52 Controller electrical diagram...
Страница 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices...
Страница 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation...
Страница 109: ...105 Exploded views of boiler parts...
Страница 114: ...110 Section Appendices...
Страница 118: ...Item Description Part Quantity 200 Fan Coupler 250 749 P 347 1 205 Fan Coupler O ring 150 254 1 114 Section Appendices...
Страница 122: ...Intentionally left empty...