Figure 8 :
Top view - SL 30-199 G3
Figure 9 :
Bottom view - SL 30-199 G3
Connection specifications
The following table displays the required connection specifications.
SL 10-85 G3,
SL 14-115 G3
SL 20-160 G3
SL 30-199 G3
A
Flue Outlet
3" Schedule 40 or 3" PPs (80mm)
B
Combustion Air
3" Schedule 40 or 3" PPs (80mm)
C
LCD Display
2¼" x 4"
D
Water Outlet
1" NPT-M
1" NPT-M
1¼” NPT-M
E
Water Inlet
1" NPT-M
1" NPT-M
1¼” NPT-M
F
Knock-outs (8)
½"
G
Gas Inlet
½" NPT-F
H
Condensate Outlet
¾" Hose
Table 1
Connections
9
Connection specifications
Содержание SL 10-85 G3
Страница 8: ...Intentionally left empty ...
Страница 14: ...Intentionally left empty ...
Страница 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Страница 78: ...Intentionally left empty ...
Страница 92: ...Intentionally left empty ...
Страница 105: ...101 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 52 Controller electrical diagram ...
Страница 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Страница 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Страница 109: ...105 Exploded views of boiler parts ...
Страница 114: ...110 Section Appendices ...
Страница 118: ...Item Description Part Quantity 200 Fan Coupler 250 749 P 347 1 205 Fan Coupler O ring 150 254 1 114 Section Appendices ...
Страница 122: ...Intentionally left empty ...