Installation & Commissioning Report
Model Number _____________________ Serial Number ________________________________
Date of Installation ________ Address of installation ____________________________________
User contact information __________________________________________________________
Installer Information (Company & Address)_____________________________________________
Phone/Fax/E-mail ________________________________________________________________
Fuel:
□
Natural Gas
□
Propane
Gas Supply Pressure (high fire) ____ Inches w.c. Measured Rate of Input (high fire) _____Btu/hr
□
Leak testing completed
□
Gas piping
□
Venting system
□
Fan
□
combustion components
□
System Cleaned and Flushed (type of cleaner used) __________________________________
□
System Filled (type/concentration of any glycol/chemicals used) _________________________
□
Air purge completed
□
Relief Valve correctly installed and piped Relief valve “try lever” test performed
□
Condensate trap filled Condensate drain clear and free flowing Condensate Neutralization.
□
Ignition Safety Shutoff test completed. Flame current reading - High fire _____ µA - Low fire _____
µA
□
Owner advised and instructed in the safe operation and maintenance of the boiler and system.
□
Information regarding the appliance and installation received and left with owner
Combustion Readings: CO
2
_____________ % O
2
______________ % CO ____________ ppm
Flue temperature ___ Return water temperature (measure simultaneously with flue temp.) _____
Commissioning has been completed as listed on this report - Installer's Signature _____________
Installers: send this completed sheet - Fax to 604 877 0295 - or - scan and Email to [email protected].
105
Installation & Commissioning Report
Содержание IBGFSW1-0110
Страница 8: ...Intentionally left empty ...
Страница 14: ...Intentionally left empty ...
Страница 52: ...Figure 36 Two pump two load parallel piping concept 48 Section Installation ...
Страница 74: ...Intentionally left empty ...
Страница 100: ...Intentionally left empty ...
Страница 101: ...97 Appendices Wiring diagrams Figure 48 Controller electrical diagram ...
Страница 102: ...Figure 49 Internal wiring diagram 98 Section Appendices ...
Страница 103: ...Figure 50 Sequence of Operation 99 Appendices ...
Страница 106: ...102 Section Appendices ...